Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,562
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0918 # 05 Y:2015 | 05 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $80,375 | $97,500 | Not Implemented |
OK0918 # 06 Y:2015 | 06 | 2015 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $7,464 | $1,177 | Not Implemented |
OK0918 # 07 Y:2015 | 07 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,374 | $0 | Implemented |
OK0918 # 08 Y:2015 | 08 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,167 | $2,205 | Not Implemented |
OK0918 # 09 Y:2015 | 09 | 2015 | INSTALL SET-BACK TIMERS | $1,944 | $0 | Not Implemented |
OK0918 # 10 Y:2015 | 10 | 2015 | IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM | $1,481 | $0 | Implemented |
OK0918 # 11 Y:2015 | 11 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $27,241 | $2,175 | Not Implemented |
UM0461 # 01 Y:2015 | 01 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $940 | $800 | Not Implemented |
UM0461 # 02 Y:2015 | 02 | 2015 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,840 | $475 | Not Implemented |
UM0461 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,057 | $2,000 | Implemented |
UM0461 # 04 Y:2015 | 04 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,928 | $1,000 | Implemented |
UM0461 # 05 Y:2015 | 05 | 2015 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $479 | $200 | Not Implemented |
UM0461 # 06 Y:2015 | 06 | 2015 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $195 | $1,000 | Not Implemented |
UM0461 # 07 Y:2015 | 07 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,782 | $3,000 | Not Implemented |
WM0070 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,528 | $44,678 | Implemented |
WM0070 # 02 Y:2015 | 02 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $22,791 | $20,960 | Not Implemented |
WM0070 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,447 | $520 | Implemented |
WM0070 # 04 Y:2015 | 04 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $4,545 | $6,320 | Not Implemented |
WM0070 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $2,580 | $570 | Implemented |
WM0070 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,279 | $5,355 | Implemented |
WM0070 # 07 Y:2015 | 07 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,169 | $995 | Implemented |
WM0070 # 08 Y:2015 | 08 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,038 | $1,190 | Implemented |
WM0070 # 09 Y:2015 | 09 | 2015 | INSULATE BARE EQUIPMENT | $828 | $94 | Implemented |
CO0709 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,310 | $1,000 | Implemented |
CO0709 # 02 Y:2015 | 02 | 2015 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $960 | $630 | Not Implemented |