IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,485

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1502 # 13 Y:2015 13 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $48,323 $123,975 Not Implemented
UK1502 # 14 Y:2015 14 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $783 $1,200 Implemented
WV0502 # 01 Y:2015 01 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,685 $1,000 Implemented
WV0502 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,334 $25,930 Implemented
WV0502 # 03 Y:2015 03 2015 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,681 $18,000 Implemented
WV0502 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,838 $20,000 Not Implemented
WV0502 # 05 Y:2015 05 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,333 $2,500 Not Implemented
WV0502 # 06 Y:2015 06 2015 OPTIMIZE PLANT POWER FACTOR $3,830 $16,400 Not Implemented
WV0502 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $3,350 $724 Implemented
WV0502 # 08 Y:2015 08 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,826 $500 Implemented
WV0502 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $812 $2,934 Implemented
WV0502 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $321 $854 Implemented
DL0140 # 01 Y:2015 01 2015 REDUCE VENTILATION AIR $169,710 $0 Implemented
DL0140 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $16,140 $5,060 Not Implemented
DL0140 # 03 Y:2015 03 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,235 $3,000 Implemented
DL0140 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,305 $98,895 Not Implemented
DL0140 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $3,810 $1,640 Not Implemented
DL0140 # 06 Y:2015 06 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,660 $74,190 Not Implemented
MI0274 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,151 $1,660 Implemented
MI0274 # 02 Y:2015 02 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,336 $140 Implemented
MI0274 # 03 Y:2015 03 2015 BURN A LESS EXPENSIVE GRADE OF FUEL $10,584 $14,880 Not Implemented
MI0274 # 04 Y:2015 04 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,327 $4,691 Implemented
MI0274 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,833 $11,640 Implemented
MI0274 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,565 $40 Implemented
MI0274 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,430 $1,710 Implemented