Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
188
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0217 # 01 Y:2023 | 01 | 2023 | Install Anaerobic Digester | $648,030 | $7,400,000 | Implemented |
UU0217 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,807 | $8,910 | Implemented |
UU0195 # 09 Y:2022 | 09 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $883 | $1,000 | Not Implemented |
UU0195 # 03 Y:2022 | 03 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,645 | $2,000 | Not Implemented |
UU0195 # 07 Y:2022 | 07 | 2022 | INSTALL OCCUPANCY SENSORS | $1,910 | $3,500 | Not Implemented |
UU0195 # 05 Y:2022 | 05 | 2022 | INSULATE BARE EQUIPMENT | $3,620 | $7,340 | Not Implemented |
UU0195 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,777 | $3,908 | Not Implemented |
UU0195 # 01 Y:2022 | 01 | 2022 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $13,680 | $22,600 | Not Implemented |
UU0195 # 02 Y:2022 | 02 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,177 | $25,216 | Not Implemented |
UU0195 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $4,698 | $20,000 | Not Implemented |
UU0195 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,050 | $218 | Not Implemented |
UU0187 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $735 | $1,470 | Implemented |
UU0187 # 02 Y:2021 | 02 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,910 | $10,200 | Not Implemented |
UU0187 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $9,400 | $14,500 | Not Implemented |
UU0187 # 04 Y:2021 | 04 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $750 | $870 | Not Implemented |
UU0180 # 09 Y:2021 | 09 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $323 | $227 | Implemented |
UU0180 # 07 Y:2021 | 07 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $503 | $503 | Not Implemented |
UU0180 # 02 Y:2021 | 02 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,938 | $33,750 | Not Implemented |
UU0180 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $776 | $126 | Implemented |
UU0180 # 08 Y:2021 | 08 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $425 | $815 | Not Implemented |
UU0180 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,445 | $6,445 | Not Implemented |
UU0180 # 03 Y:2021 | 03 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,182 | $4,000 | Implemented |
UU0180 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $12,454 | $25,000 | Not Implemented |
UU0180 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,073 | $13,873 | Implemented |
UU0179 # 05 Y:2021 | 05 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,131 | $100 | Implemented |