Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,485
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0209 # 11 Y:2011 | 11 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,779 | $45,345 | Not Implemented |
MI0209 # 12 Y:2011 | 12 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,268 | $3,200 | Implemented |
MI0209 # 13 Y:2011 | 13 | 2011 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $7,944 | $2,000 | Not Implemented |
MI0209 # 14 Y:2011 | 14 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,235 | $3,450 | Implemented |
MI0209 # 15 Y:2011 | 15 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,926 | $3,450 | Implemented |
UD0836 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,705 | $2,196 | Not Implemented |
UD0836 # 02 Y:2011 | 02 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,796 | $36 | Not Implemented |
UD0836 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,689 | $7,000 | Not Implemented |
UD0836 # 04 Y:2011 | 04 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $37,847 | $32,000 | Not Implemented |
UD0836 # 05 Y:2011 | 05 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,178 | $1,000 | Not Implemented |
UD0836 # 06 Y:2011 | 06 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,960 | $1,140 | Not Implemented |
UD0836 # 07 Y:2011 | 07 | 2011 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $12,875 | $15,000 | Not Implemented |
UD0836 # 08 Y:2011 | 08 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,572 | $99,100 | Not Implemented |
UD0836 # 09 Y:2011 | 09 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $25,293 | $18,000 | Not Implemented |
UD0836 # 10 Y:2011 | 10 | 2011 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,389 | $10,000 | Not Implemented |
GT0880 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,831 | $1,250 | Implemented |
GT0880 # 02 Y:2011 | 02 | 2011 | USE SYNTHETIC LUBRICANT | $13,152 | $0 | Not Implemented |
GT0880 # 03 Y:2011 | 03 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,390 | $244 | Not Implemented |
GT0880 # 04 Y:2011 | 04 | 2011 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $75,872 | $100,115 | Implemented |
GT0880 # 05 Y:2011 | 05 | 2011 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $70,097 | $17,000 | Implemented |
GT0880 # 06 Y:2011 | 06 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,994 | $5,000 | Not Implemented |
GT0880 # 07 Y:2011 | 07 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,232 | $38,000 | Not Implemented |
DL0066 # 01 Y:2011 | 01 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,960 | $1,035 | Implemented |
DL0066 # 02 Y:2011 | 02 | 2011 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $101,455 | $36,300 | Not Implemented |
DL0066 # 03 Y:2011 | 03 | 2011 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,460 | $2,000 | Implemented |