Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,562
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0334 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,215 | $4,750 | Not Implemented |
SF0334 # 09 Y:2006 | 09 | 2006 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,759 | $8,589 | Not Implemented |
SF0334 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $631 | $3,801 | Not Implemented |
SF0334 # 11 Y:2006 | 11 | 2006 | ELIMINATE/REDUCE AN OPERATION | $11,475 | $16,945 | Not Implemented |
CO0589 # 01 Y:2006 | 01 | 2006 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $264,540 | $1,173,000 | Not Implemented |
CO0589 # 02 Y:2006 | 02 | 2006 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $56,580 | $570 | Implemented |
CO0589 # 03 Y:2006 | 03 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $950 | $500 | Implemented |
CO0589 # 04 Y:2006 | 04 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $23,960 | $0 | Implemented |
CO0589 # 05 Y:2006 | 05 | 2006 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $21,540 | $100,800 | Not Implemented |
CO0589 # 06 Y:2006 | 06 | 2006 | USE SOLAR HEAT TO MAKE ELECTRICTY | $3,910 | $32,600 | Not Implemented |
WI0521 # 01 Y:2006 | 01 | 2006 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $222,888 | $230,600 | Not Implemented |
WI0521 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,408 | $13,600 | Not Implemented |
WI0521 # 03 Y:2006 | 03 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,900 | $18,000 | Not Implemented |
WI0521 # 04 Y:2006 | 04 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,386 | $11,000 | Not Implemented |
WI0521 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,630 | $3,200 | Not Implemented |
WI0521 # 06 Y:2006 | 06 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,035 | $500 | Not Implemented |
WI0521 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $630 | $0 | Not Implemented |
OK0735 # 01 Y:2006 | 01 | 2006 | REDUCE EXCESSIVE BOILER BLOWDOWN | $69,788 | $55,933 | Not Implemented |
OK0735 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,821 | $9,500 | Not Implemented |
OK0735 # 03 Y:2006 | 03 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $29,625 | $4,000 | Not Implemented |
OK0735 # 04 Y:2006 | 04 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,193 | $12,830 | Not Implemented |
OK0735 # 05 Y:2006 | 05 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,240 | $700 | Not Implemented |
SF0330 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,017 | $0 | Implemented |
SF0330 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,235 | $117 | Not Implemented |
SF0330 # 03 Y:2006 | 03 | 2006 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $5,332 | $3,710 | Not Implemented |