IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,392

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0613 # 02 Y:2024 02 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16,636 $2,272 n/a
SF0613 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,003 $100 n/a
SF0612 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,468 $41,738 n/a
SF0612 # 06 Y:2024 06 2024 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $21,923 $54,880 n/a
SF0612 # 05 Y:2024 05 2024 USE OPTIMUM THICKNESS INSULATION $106 $151 n/a
SF0612 # 04 Y:2024 04 2024 ISOLATE HOT OR COLD EQUIPMENT $3,665 $4,130 n/a
SF0612 # 03 Y:2024 03 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $73,026 $18,461 n/a
SF0612 # 02 Y:2024 02 2024 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $175 $59 n/a
SF0612 # 01 Y:2024 01 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,332 $226 n/a
SF0611 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $165,339 $1,651,070 Implemented
SF0611 # 05 Y:2024 05 2024 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,909 $18,675 Not Implemented
SF0611 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,353 $2,100 Not Implemented
SF0611 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $61,975 $1,800 Implemented
SF0611 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $4,908 $0 Implemented
SF0611 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $14,817 $0 Implemented
SF0610 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,191 $83,238 Not Implemented
SF0610 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,215 $0 Implemented
SF0610 # 02 Y:2024 02 2024 REPAIR AND ELIMINATE STEAM LEAKS $12,954 $0 Implemented
SF0610 # 03 Y:2024 03 2024 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $32,003 $15,909 Implemented
SF0610 # 04 Y:2024 04 2024 HEAT WATER WITH EXHAUST HEAT $36,485 $30,037 Implemented
SF0610 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,683 $31,050 Implemented
SF0610 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $8,502 $10,799 Implemented
SF0610 # 08 Y:2024 08 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $85,768 $772,344 Not Implemented
CI0023 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $78,738 $658,288 n/a
CI0023 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $45,480 $17,533 n/a