IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

92

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0933 # 06 Y:2016 06 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,272 $3,404 Implemented
OK0933 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,999 $48,276 Implemented
OK0933 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,290 $20,770 Implemented
OK0933 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,485 $7,280 Implemented
OK0933 # 04 Y:2016 04 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,259 $0 Implemented
OK0933 # 05 Y:2016 05 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $24,062 $20,162 Implemented
OK0933 # 07 Y:2016 07 2016 REPAIR AND ELIMINATE STEAM LEAKS $353 $240 Implemented
OK0933 # 08 Y:2016 08 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,193 $83,117 Not Implemented
OK0933 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,966 $2,400 Implemented
OK0933 # 10 Y:2016 10 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,618 $10,720 Not Implemented
OK0933 # 11 Y:2016 11 2016 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $285,555 $1,927,657 Not Implemented
OK0933 # 12 Y:2016 12 2016 SELL COMBUSTIBLE WASTE $24,120 $480 Not Implemented
OK0918 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $80,375 $97,500 Not Implemented
OK0918 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,107 $30,228 Not Implemented
OK0918 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $9,764 $29,490 Not Implemented
OK0918 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,801 $8,234 Not Implemented
OK0918 # 04 Y:2015 04 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,151 $4,000 Not Implemented
OK0918 # 06 Y:2015 06 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $7,464 $1,177 Not Implemented
OK0918 # 08 Y:2015 08 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,167 $2,205 Not Implemented
OK0918 # 09 Y:2015 09 2015 INSTALL SET-BACK TIMERS $1,944 $0 Not Implemented
OK0918 # 10 Y:2015 10 2015 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $1,481 $0 Implemented
OK0918 # 11 Y:2015 11 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $27,241 $2,175 Not Implemented
OK0918 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,374 $0 Implemented
OK0909 # 10 Y:2015 10 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,060 $1,875 Implemented
OK0909 # 11 Y:2015 11 2015 RECOVER WASTE HEAT FROM EQUIPMENT $25,364 $2,846 Implemented