IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0811 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,607 $6,694 Not Implemented
GT0811 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,135 $3,000 Implemented
GT0811 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,312 $750 Implemented
GT0811 # 06 Y:2005 06 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,877 $1,300 Implemented
GT0811 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,119 $5,334 Not Implemented
GT0811 # 08 Y:2005 08 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $162,720 $25,000 Not Implemented
IC0110 # 01 Y:2005 01 2005 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $106,617 $213,420 Implemented
IC0110 # 02 Y:2005 02 2005 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $79,621 $634,572 Not Implemented
IC0110 # 03 Y:2005 03 2005 REPAIR OR REPLACE STEAM TRAPS $29,831 $1,638 Implemented
IC0110 # 04 Y:2005 04 2005 REPAIR AND ELIMINATE STEAM LEAKS $6,051 $400 Implemented
IC0110 # 05 Y:2005 05 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $13,789 $3,500 Implemented
IC0110 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,956 $0 Implemented
IC0110 # 07 Y:2005 07 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $7,443 $15,000 Not Implemented
IC0110 # 08 Y:2005 08 2005 OPTIMIZE PLANT POWER FACTOR $13,904 $70,000 Implemented
IC0110 # 09 Y:2005 09 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,156 $81,881 Implemented
IC0110 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $473 $3,388 Implemented
SD0373 # 01 Y:2005 01 2005 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $34,083 $56,520 Not Implemented
SD0373 # 02 Y:2005 02 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,494 $3,900 Not Implemented
SD0373 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,208 $0 Not Implemented
SD0373 # 04 Y:2005 04 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,475 $450 Not Implemented
SD0373 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,918 $36,052 Not Implemented
SD0373 # 06 Y:2005 06 2005 USE PHOTOCELL CONTROLS $4,982 $615 Not Implemented
SD0373 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $3,212 $90 Not Implemented
SD0373 # 08 Y:2005 08 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $171,742 $50,000 Not Implemented
SD0373 # 09 Y:2005 09 2005 AUTOMATE FINISHING PROCESS $17,209 $30,000 Not Implemented