IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0483 # 03 Y:2005 03 2005 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $21,300 $5,100 Implemented
OR0483 # 04 Y:2005 04 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $8,960 $3,000 Implemented
OR0483 # 05 Y:2005 05 2005 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $41,000 $69,000 Implemented
OR0483 # 06 Y:2005 06 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $40,390 $72,000 Implemented
OR0483 # 07 Y:2005 07 2005 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS $5,131 $15,000 Not Implemented
LL0227 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $24,360 $0 Not Implemented
LL0227 # 02 Y:2005 02 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,515 $2,800 Implemented
LL0227 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,336 $2,600 Implemented
LL0227 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $1,045 $0 Not Implemented
LL0227 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $944 $150 Implemented
LL0227 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $851 $0 Not Implemented
LL0227 # 07 Y:2005 07 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $465 $0 Implemented
LL0227 # 08 Y:2005 08 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $5,500 $250 Implemented
LL0226 # 01 Y:2005 01 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,228 $1,600 Implemented
LL0226 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $6,074 $0 Not Implemented
LL0226 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,146 $700 Implemented
LL0226 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $745 $300 Implemented
LL0226 # 05 Y:2005 05 2005 USE PHOTOCELL CONTROLS $464 $0 Not Implemented
LL0226 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $62 $0 Not Implemented
LL0226 # 07 Y:2005 07 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,875 $350 Implemented
UD0720 # 01 Y:2005 01 2005 USE MINIMUM STEAM OPERATING PRESSURE $6,931 $0 Not Implemented
UD0720 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,769 $0 Implemented
UD0720 # 03 Y:2005 03 2005 OPTIMIZE PLANT POWER FACTOR $3,870 $6,000 Implemented
UD0720 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,757 $3,200 Implemented
UD0720 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $2,200 $225 Implemented