IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0303 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,229 $8,237 Implemented
SF0303 # 07 Y:2005 07 2005 USE PHOTOCELL CONTROLS $3,343 $11,115 Not Implemented
SF0303 # 08 Y:2005 08 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,447 $79,682 Not Implemented
SF0303 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,092 $39,414 Implemented
SF0303 # 10 Y:2005 10 2005 REDUCE WATER USE WITH COUNTER CURRENT RINSING $0 $95 Implemented
SF0303 # 11 Y:2005 11 2005 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $0 $10,000 Implemented
SF0303 # 12 Y:2005 12 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $0 $16,945 Not Implemented
MA0575 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $68,834 $23,508 Implemented
MA0575 # 02 Y:2005 02 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $26,800 $41,620 Implemented
MA0575 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $18,805 $517 Implemented
MA0575 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $1,944 $7,285 Implemented
MA0575 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,023 $0 Not Implemented
MA0575 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $512 $195 Not Implemented
MA0575 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $233 $30 Not Implemented
OR0481 # 01 Y:2005 01 2005 UPGRADE CONTROLS ON COMPRESSORS $32,471 $0 Not Implemented
OR0481 # 02 Y:2005 02 2005 INSTALL SET-BACK TIMERS $2,880 $300 Not Implemented
OR0481 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $25,000 $26,000 Implemented
OR0481 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $7,319 $8,000 Not Implemented
LL0222 # 01 Y:2005 01 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,478 $2,000 Implemented
LL0222 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,091 $580 Implemented
LL0222 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,261 $500 Implemented
LL0222 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $241 $0 Not Implemented
LL0222 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $211 $0 Not Implemented
LL0222 # 06 Y:2005 06 2005 USE RADIANT HEATER FOR SPOT HEATING $123 $0 Not Implemented
LL0222 # 07 Y:2005 07 2005 MINIMIZE WATER USAGE $1,344 $0 Implemented