Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,562
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0559 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,070 | $440 | Implemented |
CO0559 # 02 Y:2004 | 02 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $355 | $416 | Implemented |
CO0559 # 03 Y:2004 | 03 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,190 | $740 | Implemented |
CO0559 # 04 Y:2004 | 04 | 2004 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $1,180 | $810 | Implemented |
CO0559 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $710 | $1,790 | Implemented |
CO0559 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $1,760 | $2,260 | Implemented |
CO0559 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $572 | $292 | Implemented |
CO0559 # 08 Y:2004 | 08 | 2004 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $650 | $4,550 | Not Implemented |
SU0206 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,971 | $0 | Not Implemented |
SU0206 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,139 | $1,148 | Implemented |
SU0206 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,234 | $1,352 | Implemented |
SU0206 # 04 Y:2005 | 04 | 2005 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $255,262 | $207,240 | Implemented |
SU0206 # 05 Y:2005 | 05 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $102,975 | $200,000 | n/a |
OK0704 # 01 Y:2005 | 01 | 2005 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $7,257 | $5,175 | Not Implemented |
OK0704 # 02 Y:2005 | 02 | 2005 | OPERATE BOILERS ON HIGH FIRE SETTING | $4,358 | $1,436 | Not Implemented |
OK0704 # 03 Y:2005 | 03 | 2005 | INSTALL OCCUPANCY SENSORS | $820 | $688 | Not Implemented |
OK0704 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,912 | $8,734 | Not Implemented |
OK0704 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,011 | $2,257 | Not Implemented |
OK0704 # 06 Y:2005 | 06 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,769 | $11,310 | Not Implemented |
OK0704 # 07 Y:2005 | 07 | 2005 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $8,000 | $0 | Not Implemented |
OK0704 # 08 Y:2005 | 08 | 2005 | INSTALL SET-BACK TIMERS | $1,663 | $20 | Not Implemented |
OK0704 # 09 Y:2005 | 09 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,463 | $13,554 | Not Implemented |
OK0704 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $165 | $1,153 | Not Implemented |
MI0101 # 01 Y:2005 | 01 | 2005 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $51,010 | $72,500 | Not Implemented |
MI0101 # 02 Y:2005 | 02 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $12,178 | $180 | Implemented |