IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0078 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $4,064 $264 Implemented
LM0078 # 04 Y:2004 04 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $5,504 $1,585 Implemented
LM0078 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $238 $142 Implemented
LM0078 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,731 $0 Not Implemented
LM0078 # 07 Y:2004 07 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $182,520 $80,000 Not Implemented
LM0078 # 08 Y:2004 08 2004 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $150,678 $1,000 Implemented
LM0078 # 09 Y:2004 09 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $78,000 $2,372 Not Implemented
LM0078 # 10 Y:2004 10 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $298,998 $56,840 Implemented
LM0078 # 11 Y:2004 11 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $69,741 $2,000 Implemented
LM0078 # 12 Y:2004 12 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $10,036 $4,988 Not Implemented
IC0079 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $522 $400 Implemented
IC0079 # 02 Y:2004 02 2004 USE OPTIMUM TEMPERATURE $4,226 $0 Not Implemented
IC0079 # 03 Y:2004 03 2004 INSTALL AUTOMATIC STACK DAMPER $943 $375 Not Implemented
IC0079 # 04 Y:2004 04 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $311 $224 Implemented
IC0079 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,244 $18,858 Implemented
IC0079 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $2,248 $9,540 Implemented
IC0079 # 07 Y:2004 07 2004 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $1,706 $0 Not Implemented
IC0079 # 08 Y:2004 08 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,734 $0 Implemented
IC0079 # 09 Y:2004 09 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,159,243 $6,681,290 Implemented
OR0457 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,600 $25,000 Implemented
OR0457 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,140 $10,000 Not Implemented
OR0457 # 03 Y:2004 03 2004 UPGRADE CONTROLS ON COMPRESSORS $31,300 $0 Implemented
OR0457 # 04 Y:2004 04 2004 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,100 $42,000 Not Implemented
OR0457 # 05 Y:2004 05 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,900 $0 Implemented
OR0457 # 06 Y:2004 06 2004 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $2,520 $300 Implemented