IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0249 # 13 Y:2003 13 2003 INSTALL OCCUPANCY SENSORS $950 $1,200 Not Implemented
BD0249 # 14 Y:2003 14 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $885 $200 Not Implemented
BD0249 # 15 Y:2003 15 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $755 $0 Not Implemented
BD0249 # 16 Y:2003 16 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $575 $24 Not Implemented
BD0249 # 17 Y:2003 17 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $294 $335 Implemented
BD0249 # 18 Y:2003 18 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $274 $500 Not Implemented
BD0249 # 19 Y:2003 19 2003 TREAT AND REUSE RINSE WATERS $29,980 $10,000 Not Implemented
BD0249 # 20 Y:2003 20 2003 MINIMIZE WATER USAGE $11,992 $0 Implemented
BD0249 # 21 Y:2003 21 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $22,695 $99,000 Not Implemented
BD0249 # 22 Y:2003 22 2003 PAY BILLS ON TIME TO AVOID LATE FEES $2,256 $0 Not Implemented
BD0249 # 23 Y:2003 23 2003 AUTOMATE PAYROLL SYSTEM $1,639 $2,500 Implemented
SU0173 # 01 Y:2004 01 2004 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $13,244 $0 Not Implemented
SU0173 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,991 $0 Not Implemented
SU0173 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $919 $57 Implemented
SU0173 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,102 $117 Not Implemented
SU0173 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,444 $4,290 Not Implemented
SU0173 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,001 $9,164 Implemented
SU0173 # 07 Y:2004 07 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,555 $48,418 Not Implemented
UM0245 # 01 Y:2004 01 2004 REDUCE SCRAP PRODUCTION $21,060 $2,288 Not Implemented
UM0245 # 02 Y:2004 02 2004 REPLACE BOILER $13,000 $34,000 Not Implemented
UM0245 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $7,445 $3,985 Not Implemented
UM0245 # 04 Y:2004 04 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,060 $12,288 Implemented
UM0245 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,670 $500 Not Implemented
UM0245 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,500 $7,700 Not Implemented
UM0245 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $225 Implemented