Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,562
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0757 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,612 | $0 | Not Implemented |
OR0757 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $26,900 | $0 | Not Implemented |
OR0757 # 03 Y:2022 | 03 | 2022 | INSTALL AUTOMATIC PACKING EQUIPMENT | $97,200 | $50,000 | Not Implemented |
OR0757 # 04 Y:2022 | 04 | 2022 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $194,400 | $300,000 | Not Implemented |
MI0410 # 01 Y:2022 | 01 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,438 | $580 | Implemented |
MI0410 # 02 Y:2022 | 02 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,151 | $7,280 | Implemented |
MI0410 # 03 Y:2022 | 03 | 2022 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $5,890 | $80 | Not Implemented |
MI0410 # 04 Y:2022 | 04 | 2022 | USE SOLAR HEAT TO HEAT WATER | $3,955 | $18,399 | Not Implemented |
MI0410 # 05 Y:2022 | 05 | 2022 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $3,575 | $597 | Implemented |
MI0410 # 06 Y:2022 | 06 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,493 | $140 | Implemented |
MI0410 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,361 | $10,695 | Implemented |
MI0410 # 08 Y:2022 | 08 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,073 | $2,150 | Not Implemented |
MI0409 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO HEAT WATER | $24,802 | $108,191 | Not Implemented |
MI0409 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,919 | $1,980 | Not Implemented |
MI0409 # 03 Y:2022 | 03 | 2022 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,003 | $14,690 | Implemented |
MI0409 # 04 Y:2022 | 04 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,496 | $240 | Not Implemented |
MI0409 # 05 Y:2022 | 05 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,094 | $1,885 | Implemented |
MI0409 # 06 Y:2022 | 06 | 2022 | INSTALL OCCUPANCY SENSORS | $235 | $700 | Implemented |
MI0409 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $222 | $363 | Implemented |
MZ0333 # 01 Y:2022 | 01 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,542 | $3,330 | Not Implemented |
MZ0333 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,379 | $21,815 | Not Implemented |
MZ0333 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,733 | $1,330 | Not Implemented |
MZ0333 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,752 | $66 | Not Implemented |
IP0161 # 01 Y:2022 | 01 | 2022 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $94 | $0 | Implemented |
IP0161 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,573 | $0 | Implemented |