Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
183
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0176 # 02 Y:2015 | 02 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $22,758 | $100,000 | Not Implemented |
MZ0176 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $16,004 | $6,500 | Not Implemented |
MZ0176 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,923 | $1,000 | Not Implemented |
MZ0176 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,037 | $1,560 | Not Implemented |
MZ0176 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $62,569 | $115,650 | Not Implemented |
MZ0176 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $30,675 | $7,500 | Not Implemented |
MZ0176 # 08 Y:2015 | 08 | 2015 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $2,330 | $3,500 | Not Implemented |
MZ0176 # 09 Y:2015 | 09 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,580 | $9,500 | Not Implemented |
MZ0156 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,514 | $71,320 | Implemented |
MZ0156 # 02 Y:2014 | 02 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,480 | $2,000 | Implemented |
MZ0156 # 03 Y:2014 | 03 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,460 | $400 | Implemented |
MZ0156 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,886 | $4,400 | Implemented |
MZ0156 # 05 Y:2014 | 05 | 2014 | USE OPTIMUM THICKNESS INSULATION | $9,068 | $30,128 | Implemented |
MZ0156 # 06 Y:2014 | 06 | 2014 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,337 | $676 | Not Implemented |
MZ0156 # 07 Y:2014 | 07 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $31,514 | $141,366 | Implemented |
MZ0156 # 08 Y:2014 | 08 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,299 | $10,282 | Implemented |
MZ0155 # 01 Y:2014 | 01 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,080 | $1,350 | Not Implemented |
MZ0155 # 02 Y:2014 | 02 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,171 | $1,000 | Not Implemented |
MZ0155 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,118 | $1,525 | Not Implemented |
MZ0155 # 04 Y:2014 | 04 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,228 | $750 | Not Implemented |
MZ0141 # 01 Y:2014 | 01 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,625 | $7,000 | Implemented |
MZ0141 # 02 Y:2014 | 02 | 2014 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $12,947 | $24,000 | Not Implemented |
MZ0141 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,254 | $11,500 | Not Implemented |
MZ0141 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,000 | $6,000 | Not Implemented |
MZ0141 # 05 Y:2014 | 05 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,440 | $2,500 | Not Implemented |