IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

331

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0694 # 01 Y:2017 01 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $190,250 $7,842 Not Implemented
BS0108 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $6,587 $25,166 Not Implemented
BS0108 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $104 $165 Not Implemented
BS0108 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $443 $1,238 Not Implemented
BS0108 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,696 $1,050 Not Implemented
BS0108 # 06 Y:2017 06 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $240 $270 Not Implemented
OR0672 # 03 Y:2016 03 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $39,775 $138,248 Not Implemented
OR0672 # 02 Y:2016 02 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $21,014 $35,396 Not Implemented
OR0672 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,924 $26,614 Not Implemented
OR0656 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,282 $22,500 Implemented
OR0656 # 04 Y:2015 04 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $317,386 $0 Not Implemented
OR0656 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,591 $27,789 Implemented
OR0656 # 02 Y:2015 02 2015 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $188,688 $247,000 Implemented
OR0656 # 01 Y:2015 01 2015 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,308,919 $1,300,000 Implemented
OR0653 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,625 $1,000 Not Implemented
OR0653 # 05 Y:2015 05 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,262 $15,398 Not Implemented
OR0653 # 04 Y:2015 04 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $611 $1,058 Not Implemented
OR0653 # 03 Y:2015 03 2015 USE OPTIMUM THICKNESS INSULATION $3,897 $4,580 Not Implemented
OR0653 # 02 Y:2015 02 2015 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $36,536 $30,728 Not Implemented
OR0653 # 01 Y:2015 01 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $118,419 $40,792 Not Implemented
OR0652 # 05 Y:2015 05 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,000 $15,000 Not Implemented
OR0652 # 04 Y:2015 04 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $6,390 $51,745 Not Implemented
OR0652 # 03 Y:2015 03 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,990 $0 Not Implemented
OR0652 # 02 Y:2015 02 2015 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,010 $2,900 Not Implemented
OR0652 # 01 Y:2015 01 2015 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $7,000 $54,000 Not Implemented