IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,392

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0283 # 10 Y:2004 10 2004 USE AN AUTOMATIC PLATE PROCESSOR $27,300 $40,500 Implemented
SF0283 # 11 Y:2004 11 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $227,033 $40,600 Not Implemented
SF0282 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,198 $0 Implemented
SF0282 # 02 Y:2004 02 2004 INSTALL STEAM TRAP $1,304 $299 Implemented
SF0282 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,053 $2,417 Implemented
SF0282 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $2,015 $1,440 Not Implemented
SF0282 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,516 $14,960 Not Implemented
SF0282 # 06 Y:2004 06 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $272 $571 Not Implemented
SF0282 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $442 $1,200 Implemented
SF0282 # 08 Y:2004 08 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,037 $5,155 Not Implemented
SF0282 # 09 Y:2004 09 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,517 $8,685 Not Implemented
SF0282 # 10 Y:2004 10 2004 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $34,944 $72 Implemented
SF0282 # 11 Y:2004 11 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $20,271 $21,650 Not Implemented
SF0282 # 12 Y:2004 12 2004 OPTIMIZE PLANT POWER FACTOR $3,645 $2,914 Not Implemented
SD0336 # 01 Y:2004 01 2004 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $29,002 $0 Implemented
SD0336 # 02 Y:2004 02 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,058 $46,550 Not Implemented
SD0336 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,638 $6,230 Implemented
SD0336 # 04 Y:2004 04 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,095 $0 Implemented
SD0336 # 05 Y:2004 05 2004 COMBINE UTILITY METERS $4,389 $8,000 Not Implemented
SF0278 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,074 $0 n/a
SF0278 # 02 Y:2004 02 2004 REPAIR AND ELIMINATE STEAM LEAKS $3,660 $312 n/a
SF0278 # 03 Y:2004 03 2004 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $65,362 $60,000 n/a
SF0278 # 04 Y:2004 04 2004 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $1,624 $1,887 n/a
SF0278 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $454 n/a
SF0278 # 06 Y:2004 06 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,847 $3,074 n/a