Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
188
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0101 # 01 Y:2006 | 01 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $16,190 | $10,000 | Not Implemented |
UU0101 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,280 | $4,150 | Not Implemented |
UU0101 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,230 | $3,050 | Not Implemented |
UU0101 # 04 Y:2006 | 04 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,760 | $10,030 | Not Implemented |
UU0101 # 05 Y:2006 | 05 | 2006 | OPTIMIZE PLANT POWER FACTOR | $3,770 | $4,140 | Not Implemented |
UU0101 # 06 Y:2006 | 06 | 2006 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $100,330 | $52,800 | Not Implemented |
UU0095 # 01 Y:2005 | 01 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,360 | $2,000 | Implemented |
UU0095 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,800 | $20,000 | Not Implemented |
UU0095 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $54,985 | $40,000 | Not Implemented |
UU0095 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $710 | $305 | Not Implemented |
UU0095 # 05 Y:2005 | 05 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,720 | $450 | Not Implemented |
UU0094 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,140 | $380 | Not Implemented |
UU0094 # 02 Y:2005 | 02 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,260 | $7,000 | Not Implemented |
UU0094 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $370 | $220 | Not Implemented |
UU0094 # 04 Y:2005 | 04 | 2005 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,540 | $0 | Not Implemented |
UU0094 # 05 Y:2005 | 05 | 2005 | USE OPTIMUM THICKNESS INSULATION | $110 | $150 | Not Implemented |
UU0077 # 01 Y:2004 | 01 | 2004 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $12,125 | $2,670 | Not Implemented |
UU0077 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,520 | $5,000 | Implemented |
UU0077 # 03 Y:2004 | 03 | 2004 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $14,890 | $45,000 | Implemented |
UU0077 # 04 Y:2004 | 04 | 2004 | ADJUST PH FOR NEUTRALIZATION | $12,850 | $45,920 | Not Implemented |
UU0076 # 01 Y:2004 | 01 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,600 | $2,000 | Not Implemented |
UU0076 # 02 Y:2004 | 02 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $24 | $40 | Not Implemented |
UU0076 # 03 Y:2004 | 03 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $30 | $0 | Not Implemented |
UU0076 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,300 | $4,824 | Not Implemented |
UU0076 # 05 Y:2004 | 05 | 2004 | METER WASTE WATER | $5,360 | $1,500 | Not Implemented |