Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,562
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0558 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,252 | $4,542 | Implemented |
SF0558 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,759 | $2,995 | Implemented |
SF0558 # 06 Y:2020 | 06 | 2020 | INSULATE BARE EQUIPMENT | $282 | $379 | Implemented |
SF0558 # 07 Y:2020 | 07 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $30,342 | $50,211 | Not Implemented |
SF0558 # 08 Y:2020 | 08 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,149 | $6,701 | Not Implemented |
SF0558 # 09 Y:2020 | 09 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $145 | $591 | Implemented |
SF0558 # 10 Y:2020 | 10 | 2020 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $9,006 | $75,000 | Not Implemented |
GT0949 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,422 | $400 | Not Implemented |
GT0949 # 02 Y:2020 | 02 | 2020 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $19,356 | $2,000 | Not Implemented |
GT0949 # 03 Y:2020 | 03 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,978 | $400 | Implemented |
GT0949 # 04 Y:2020 | 04 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $2,159 | $451 | Implemented |
GT0949 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,586 | $4,500 | Not Implemented |
GT0949 # 06 Y:2020 | 06 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $461 | $425 | Not Implemented |
GT0949 # 07 Y:2020 | 07 | 2020 | OPTIMIZE PLANT POWER FACTOR | $1,392 | $5,106 | Not Implemented |
WV0598 # 01 Y:2020 | 01 | 2020 | INSTALL SENSORS TO DETECT DEFECTS | $30,600 | $10,470 | Not Implemented |
WV0598 # 02 Y:2020 | 02 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $28,134 | $48,344 | Not Implemented |
WV0598 # 03 Y:2020 | 03 | 2020 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $8,920 | $11,220 | Not Implemented |
WV0598 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $7,292 | $6,768 | Implemented |
WV0598 # 05 Y:2020 | 05 | 2020 | RECYCLE WHITE WATER | $1,467 | $3,170 | Implemented |
WV0598 # 06 Y:2020 | 06 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $916 | $1,021 | Implemented |
WV0598 # 07 Y:2020 | 07 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $564 | $613 | Implemented |
AS0490 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,708 | $1,550 | Not Implemented |
AS0490 # 02 Y:2020 | 02 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $3,534 | $3,368 | Implemented |
AS0490 # 03 Y:2020 | 03 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,729 | $410 | Implemented |
AS0490 # 04 Y:2020 | 04 | 2020 | KEEP EQUIPMENT CLEAN | $991 | $464 | Implemented |