IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0500 # 01 Y:2020 01 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $285 $0 Not Implemented
SU0500 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,803 $0 Not Implemented
SU0500 # 03 Y:2020 03 2020 ELIMINATE/REDUCE AN OPERATION $11,303 $3,012 Not Implemented
SU0500 # 04 Y:2020 04 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $327 $294 Not Implemented
SU0500 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $682 $785 Not Implemented
SU0500 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,087 $14,773 Implemented
SU0500 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $257 $508 Not Implemented
UF0551 # 01 Y:2020 01 2020 Install Anaerobic Digester $1,032,365 $4,965,000 Implemented
UF0551 # 02 Y:2020 02 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $537,853 $1,400,000 Implemented
UF0551 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $62,520 $30,000 Implemented
UF0551 # 04 Y:2020 04 2020 INSTALL TURBULATORS $18,151 $7,500 Not Implemented
UF0551 # 05 Y:2020 05 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,189 $1,500 Implemented
UF0551 # 06 Y:2020 06 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,254 $4,938 Implemented
UF0551 # 07 Y:2020 07 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $2,687 $1,936 Implemented
UF0551 # 08 Y:2020 08 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,166 $0 Implemented
WM0159 # 01 Y:2020 01 2020 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $54,997 $46,180 Not Implemented
WM0159 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $50,357 $43,670 Implemented
WM0159 # 03 Y:2020 03 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $30,640 $45,000 Not Implemented
WM0159 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,843 $3,560 Not Implemented
WM0159 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $4,345 $4,350 Not Implemented
WM0159 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,043 $11,523 Not Implemented
WM0159 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $841 $0 Not Implemented
WM0159 # 08 Y:2020 08 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $780 $1,585 Not Implemented
WM0159 # 09 Y:2020 09 2020 UPGRADE CONTROLS ON COMPRESSORS $589 $1,748 Implemented
SF0556 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,802 $0 Implemented