Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,562
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0554 # 09 Y:2020 | 09 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $632 | $1,312 | Implemented |
SF0554 # 10 Y:2020 | 10 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,351 | $5,888 | Implemented |
UK2001 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,076 | $2,010 | Implemented |
UK2001 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,413 | $0 | Not Implemented |
UK2001 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,887 | $9,378 | Implemented |
UK2001 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $571 | $875 | Implemented |
UK2001 # 05 Y:2020 | 05 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,684 | $2,240 | Not Implemented |
UK2001 # 06 Y:2020 | 06 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $118,102 | $6,775 | Not Implemented |
UK2001 # 07 Y:2020 | 07 | 2020 | CLEAN CONDENSER TUBES | $4,023 | $8,700 | Implemented |
UK2001 # 08 Y:2020 | 08 | 2020 | INSULATE BARE EQUIPMENT | $2,547 | $1,006 | Not Implemented |
UK2001 # 09 Y:2020 | 09 | 2020 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $252,728 | $102,800 | Not Implemented |
UK2001 # 10 Y:2020 | 10 | 2020 | REPLACE BOILER | $10,114 | $45,600 | Not Implemented |
UK2001 # 11 Y:2020 | 11 | 2020 | OPTIMIZE PLANT POWER FACTOR | $31,564 | $19,285 | Not Implemented |
UD1015 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,207 | $0 | Implemented |
UD1015 # 02 Y:2020 | 02 | 2020 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $6,248 | $309 | Not Implemented |
UD1015 # 03 Y:2020 | 03 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,267 | $0 | Implemented |
UD1015 # 04 Y:2020 | 04 | 2020 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $769 | $1,080 | Not Implemented |
UD1015 # 05 Y:2020 | 05 | 2020 | USE MULTIPLE-EFFECT EVAPORATORS | $18,945 | $26,742 | Not Implemented |
UD1015 # 06 Y:2020 | 06 | 2020 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $7,958 | $0 | Not Implemented |
UD1015 # 07 Y:2020 | 07 | 2020 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $6,591 | $0 | Implemented |
UD1015 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $60,442 | $86,373 | Not Implemented |
UD1015 # 09 Y:2020 | 09 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,052 | $1,854 | Not Implemented |
UD1015 # 10 Y:2020 | 10 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,410 | $28,400 | Not Implemented |
SF0553 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,333 | $0 | Implemented |
SF0553 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,905 | $120 | Implemented |