IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

199

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0002 # 02 Y:2012 02 2012 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $106 $320 Not Implemented
BS0002 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $484 $580 Not Implemented
BS0002 # 04 Y:2012 04 2012 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $6,492 $5,600 Not Implemented
BS0002 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,906 $14,400 Not Implemented
UU0093 # 01 Y:2005 01 2005 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $336,460 $336,000 Not Implemented
UU0093 # 02 Y:2005 02 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $727 $495 Not Implemented
UU0093 # 03 Y:2005 03 2005 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $350 $2,000 Not Implemented
UU0093 # 04 Y:2005 04 2005 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $19,080 $0 Not Implemented
UU0093 # 05 Y:2005 05 2005 PAY UTILITY BILLS ON TIME $1,418 $0 Not Implemented
UU0093 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $777 $2,000 Not Implemented
UU0079 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,140 $18,959 Not Implemented
UU0079 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $840 $360 Not Implemented
UU0079 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,120 $710 Not Implemented
UU0079 # 04 Y:2005 04 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $130 $0 Not Implemented
UU0079 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $340 $1,380 Not Implemented
UU0079 # 06 Y:2005 06 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $284,540 $3,000,000 Not Implemented
UU0081 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,948 $2,000 Not Implemented
UU0081 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,684 $6,171 Not Implemented
UU0081 # 03 Y:2005 03 2005 INSTALL COMMON HEADER ON COMPRESSORS $1,717 $1,270 Not Implemented
UU0081 # 04 Y:2005 04 2005 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $2,724 $11,700 Not Implemented
UU0081 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,000 $500 Not Implemented
UU0081 # 06 Y:2005 06 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $996,810 $10,000,000 Not Implemented
UU0081 # 07 Y:2005 07 2005 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $117 $0 Not Implemented
UU0080 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,095 $3,040 Not Implemented
UU0080 # 02 Y:2005 02 2005 UPGRADE CONTROLS ON COMPRESSORS $5,900 $0 Not Implemented