Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
526
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0737 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,800 | $35,500 | Implemented |
AM0737 # 02 Y:2017 | 02 | 2017 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $18,400 | $0 | Implemented |
AM0737 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,300 | $1,940 | Not Implemented |
AM0737 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,610 | $120 | Not Implemented |
AM0737 # 05 Y:2017 | 05 | 2017 | OPTIMIZE PLANT POWER FACTOR | $4,070 | $6,200 | Not Implemented |
AM0737 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,360 | $710 | Implemented |
AM0737 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,210 | $3,600 | Implemented |
AM0737 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $830 | $2,000 | Implemented |
AM0737 # 09 Y:2017 | 09 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $590 | $475 | Not Implemented |
TR0004 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $666 | $1,325 | Implemented |
TR0004 # 02 Y:2017 | 02 | 2017 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,912 | $0 | Implemented |
TR0004 # 03 Y:2017 | 03 | 2017 | INSTALL REPLACEMENT DOORS | $2,305 | $10,000 | Implemented |
TR0004 # 04 Y:2017 | 04 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $273 | $0 | Implemented |
TR0004 # 05 Y:2017 | 05 | 2017 | OPTIMIZE PLANT POWER FACTOR | $12,722 | $56,000 | Implemented |
TR0004 # 06 Y:2017 | 06 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,148 | $29,271 | Not Implemented |
TR0004 # 07 Y:2017 | 07 | 2017 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $27,235 | $100,864 | Not Implemented |
TR0004 # 08 Y:2017 | 08 | 2017 | USE OTHER METHODS FOR NEUTRALIZATION | $258,000 | $292,000 | Not Implemented |
TR0002 # 01 Y:2017 | 01 | 2017 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $30,725 | $22,000 | Implemented |
TR0002 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM THICKNESS INSULATION | $6,968 | $500 | Implemented |
TR0002 # 03 Y:2017 | 03 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $9,895 | $10,000 | Not Implemented |
TR0002 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $187 | $55 | Implemented |
TR0002 # 05 Y:2017 | 05 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,329 | $60 | Implemented |
TR0002 # 06 Y:2017 | 06 | 2017 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,204 | $0 | Implemented |
AM0733 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,560 | $2,000 | Implemented |
AM0733 # 02 Y:2017 | 02 | 2017 | METER WASTE WATER | $16,425 | $3,000 | Implemented |