Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,562
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0124 # 02 Y:2019 | 02 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $392 | $1,259 | Not Implemented |
BS0124 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,609 | $1,030 | Not Implemented |
BS0124 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,460 | $2,200 | Not Implemented |
MI0356 # 01 Y:2019 | 01 | 2019 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $68,283 | $118,050 | Not Implemented |
MI0356 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,750 | $42,002 | Implemented |
MI0356 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,615 | $19,558 | Implemented |
MI0356 # 04 Y:2019 | 04 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,171 | $24,418 | Not Implemented |
MI0356 # 05 Y:2019 | 05 | 2019 | REDUCE EXCESSIVE BOILER BLOWDOWN | $10,928 | $8,500 | Implemented |
MI0356 # 06 Y:2019 | 06 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,814 | $480 | Implemented |
MI0356 # 07 Y:2019 | 07 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,181 | $2,320 | Not Implemented |
MI0356 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,569 | $2,020 | Implemented |
MI0356 # 09 Y:2019 | 09 | 2019 | USE SOLAR HEAT TO HEAT WATER | $7,502 | $13,650 | Not Implemented |
MI0356 # 10 Y:2019 | 10 | 2019 | OPTIMIZE PLANT POWER FACTOR | $7,059 | $11,855 | Not Implemented |
SF0542 # 01 Y:2019 | 01 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,762 | $0 | Implemented |
SF0542 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,796 | $1,080 | Implemented |
SF0542 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,079 | $180 | Not Implemented |
SF0542 # 04 Y:2019 | 04 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,409 | $1,384 | Implemented |
SF0542 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $143 | $111 | Not Implemented |
SF0542 # 06 Y:2019 | 06 | 2019 | USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING | $3,054 | $9,087 | Implemented |
SF0542 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,214 | $49,905 | Implemented |
MZ0277 # 01 Y:2019 | 01 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,394 | $440 | Not Implemented |
MZ0277 # 02 Y:2019 | 02 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $28,719 | $50,000 | Not Implemented |
MZ0277 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,416 | $4,211 | Implemented |
MZ0277 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $1,650 | $2,700 | Implemented |
MZ0277 # 05 Y:2019 | 05 | 2019 | INSTALL SPECTRAL REFLECTORS / DELAMP | $8,418 | $1,920 | Not Implemented |