Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,392
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0572 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46,961 | $45,208 | Not Implemented |
SF0572 # 06 Y:2021 | 06 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,350 | $4,996 | Not Implemented |
SF0572 # 07 Y:2021 | 07 | 2021 | REPLACE BOILER | $14,321 | $72,000 | Not Implemented |
SF0572 # 08 Y:2021 | 08 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $343,451 | $2,394,442 | Not Implemented |
SF0572 # 09 Y:2021 | 09 | 2021 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $134,491 | $56,667 | Not Implemented |
SF0572 # 10 Y:2021 | 10 | 2021 | INSTALL SUB-METERING EQUIPMENT | $8,446 | $6,896 | Implemented |
SD0607 # 01 Y:2021 | 01 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $26,888 | $500 | Not Implemented |
SD0607 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,809 | $38,800 | Not Implemented |
SD0607 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,885 | $2,100 | Not Implemented |
SD0607 # 04 Y:2021 | 04 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,753 | $568 | Not Implemented |
SD0607 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,289 | $2,741 | Not Implemented |
SD0607 # 06 Y:2021 | 06 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $794 | $760 | Not Implemented |
SD0607 # 07 Y:2021 | 07 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $481 | $706 | Not Implemented |
SD0607 # 08 Y:2021 | 08 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $487 | $540 | Not Implemented |
SD0601 # 01 Y:2020 | 01 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $714 | $1,555 | Implemented |
SD0601 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $295 | $504 | Implemented |
SD0601 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $139 | $225 | Implemented |
SD0601 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $130 | $360 | Not Implemented |
SF0558 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,941 | $0 | Implemented |
SF0558 # 02 Y:2020 | 02 | 2020 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $98,999 | $34,416 | Implemented |
SF0558 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,186 | $525 | Not Implemented |
SF0558 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,252 | $4,542 | Implemented |
SF0558 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,759 | $2,995 | Implemented |
SF0558 # 06 Y:2020 | 06 | 2020 | INSULATE BARE EQUIPMENT | $282 | $379 | Implemented |
SF0558 # 07 Y:2020 | 07 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $30,342 | $50,211 | Not Implemented |