Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,562
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0107 # 08 Y:2018 | 08 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $582 | $2,219 | Implemented |
IP0107 # 09 Y:2018 | 09 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,691 | $85,000 | Implemented |
OR0704 # 01 Y:2018 | 01 | 2018 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $510,333 | $740,000 | Not Implemented |
OR0704 # 02 Y:2018 | 02 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $127,144 | $201,450 | Implemented |
OR0704 # 03 Y:2018 | 03 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $40,837 | $72,155 | Not Implemented |
OR0704 # 04 Y:2018 | 04 | 2018 | MINIMIZE WATER USAGE | $28,545 | $540 | Not Implemented |
OR0704 # 05 Y:2018 | 05 | 2018 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $12,192 | $2,161 | Not Implemented |
OR0704 # 06 Y:2018 | 06 | 2018 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $5,586 | $14,266 | Not Implemented |
MZ0257 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $490 | $2,925 | Not Implemented |
MZ0257 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $869 | $5,414 | Not Implemented |
MZ0257 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $1,472 | $3,025 | Not Implemented |
MZ0257 # 04 Y:2018 | 04 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,225 | $1,800 | Implemented |
MZ0257 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,826 | $0 | Implemented |
MZ0257 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $600 | $752 | Implemented |
MZ0257 # 07 Y:2018 | 07 | 2018 | USE OPTIMUM THICKNESS INSULATION | $7,678 | $7,480 | Implemented |
MZ0257 # 08 Y:2018 | 08 | 2018 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $839 | $1,900 | Implemented |
MZ0257 # 09 Y:2018 | 09 | 2018 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,294 | $5,330 | Implemented |
MZ0257 # 10 Y:2018 | 10 | 2018 | USE COMPRESSOR AIR FILTERS | $222 | $200 | Implemented |
MZ0257 # 11 Y:2018 | 11 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,204 | $0 | Not Implemented |
MZ0257 # 12 Y:2018 | 12 | 2018 | MINIMIZE WATER USAGE | $37,478 | $0 | Implemented |
UU0137 # 01 Y:2018 | 01 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $48,448 | $23,000 | Not Implemented |
UU0137 # 02 Y:2018 | 02 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $37,021 | $24,600 | Implemented |
UU0137 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $26,521 | $17,000 | Implemented |
UU0137 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $11,622 | $7,600 | Implemented |
UU0137 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,310 | $7,650 | Implemented |