IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

610

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0440 # 02 Y:2024 02 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,169 $1,320 Implemented
MI0440 # 09 Y:2024 09 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,423 $279 Implemented
MI0440 # 08 Y:2024 08 2024 UPGRADE CONTROLS ON COMPRESSORS $8,533 $42,540 Implemented
MI0440 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,242 $860 Implemented
MI0440 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,491 $1,720 Implemented
MI0440 # 05 Y:2024 05 2024 AIR CONDITION ONLY SPACE NECESSARY $18,769 $74,097 Implemented
MI0440 # 06 Y:2024 06 2024 APPLY FOR INVESTMENT INCENTIVES $74,097 $0 Not Implemented
MI0440 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,986 $1,980 Implemented
MI0440 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $211,950 $698,434 Not Implemented
MI0420 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $15,797 $0 Implemented
MI0420 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,929 $163,200 Not Implemented
MI0420 # 09 Y:2023 09 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,456 $280 Implemented
MI0420 # 04 Y:2023 04 2023 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $22,620 $52,100 Implemented
MI0420 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $13,017 $86,104 Not Implemented
MI0420 # 08 Y:2023 08 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,784 $3,190 Not Implemented
MI0420 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,309 $1,980 Implemented
MI0420 # 02 Y:2023 02 2023 ADJUST BURNERS FOR EFFICIENT OPERATION $25,315 $1,760 Not Implemented
MI0420 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $65,480 $580 Implemented
MI0420 # 10 Y:2023 10 2023 PAY UTILITY BILLS ON TIME $111 $0 Implemented
UF0591 # 05 Y:2023 05 2023 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $12,470 $19,320 Implemented
UF0591 # 06 Y:2023 06 2023 INSTALL SUB-METERING EQUIPMENT $2,168 $8,880 Implemented
UF0591 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $48,128 $44,635 Implemented
UF0591 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $460,292 $1,330,000 Not Implemented
UF0591 # 08 Y:2023 08 2023 INSTALL TURBULATORS $1,724 $7,500 Not Implemented
UF0591 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,896 $8,591 Implemented