IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0535 # 01 Y:2015 01 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,967 $2,059 Implemented
IA0535 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,091 $70 Implemented
IA0535 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $466 $710 Implemented
IA0535 # 03 Y:2015 03 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,020 $10,595 Implemented
IA0535 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,318 $3,120 Implemented
IA0522 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,915 $89,600 Implemented
IA0516 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,151 $2,005 Implemented
IA0516 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,528 $2,790 Implemented
IA0516 # 01 Y:2014 01 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,115 $10,277 Implemented
IA0516 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,297 $376 Implemented
IA0471 # 05 Y:2011 05 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $465 $3,000 Implemented
IA0471 # 06 Y:2011 06 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,974 $1,500 Implemented
IA0471 # 04 Y:2011 04 2011 UPGRADE CONTROLS ON COMPRESSORS $2,430 $3,832 Implemented
IA0471 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,799 $227 Implemented
IA0471 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $979 $1,463 Implemented
IA0471 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $262 $250 Implemented
IA0451 # 05 Y:2010 05 2010 REDUCE VENTILATION AIR $1,483 $2,000 Implemented
IA0451 # 02 Y:2010 02 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,102 $1,000 Implemented
IA0451 # 04 Y:2010 04 2010 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $3,433 $500 Implemented
IA0451 # 03 Y:2010 03 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,659 $140 Implemented
IA0451 # 01 Y:2010 01 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,327 $1,729 Implemented
IA0398 # 11 Y:2006 11 2006 INSULATE BARE EQUIPMENT $742 $580 Implemented
IA0398 # 07 Y:2006 07 2006 REPAIR AND ELIMINATE STEAM LEAKS $7,646 $1,000 Implemented
IA0398 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,700 $39 Implemented
IA0398 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $9,808 $6,000 Implemented