IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

238

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1104 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,987 $1,552 Not Implemented
OK1104 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $14,088 $189,810 Not Implemented
OK1104 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $179 $580 Not Implemented
OK1104 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $89 $0 Not Implemented
OK1047 # 01 Y:2021 01 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,181 $17,737 Implemented
OK1047 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $876 $500 Implemented
OK1047 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,774 $6,045 Implemented
OK1047 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,212 $1,242 Implemented
OK1021 # 05 Y:2019 05 2019 INSTALL SUB-METERING EQUIPMENT $5,665 $887 Not Implemented
OK1021 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,570 $850 Implemented
OK1021 # 04 Y:2019 04 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $6,865 $426 Implemented
OK1021 # 01 Y:2019 01 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $957 $524 Implemented
OK1021 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,490 $4,312 Implemented
OK1016 # 07 Y:2019 07 2019 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $485 $636 Implemented
OK1016 # 05 Y:2019 05 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,523 $0 Not Implemented
OK1016 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,028 $28,358 Implemented
OK1016 # 06 Y:2019 06 2019 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $885 $4,860 Not Implemented
OK1016 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,330 $0 Implemented
OK1016 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $27,210 $730 Not Implemented
OK1016 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,766 $9,480 Not Implemented
OK1004 # 02 Y:2019 02 2019 IMPROVE COMBUSTION CONTROL CAPABILITY $5,516 $18,500 Not Implemented
OK1004 # 05 Y:2019 05 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,751 $8,520 Not Implemented
OK1004 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,732 $6,990 Not Implemented
OK1004 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $255 $1,132 Not Implemented
OK1004 # 04 Y:2019 04 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $679 $1,295 Not Implemented