IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

128

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0460 # 08 Y:2025 08 2025 INSULATE BARE EQUIPMENT $3,469 $1,976 n/a
MI0460 # 05 Y:2025 05 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,837 $3,373 n/a
MI0460 # 07 Y:2025 07 2025 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,172 $100 n/a
MI0460 # 06 Y:2025 06 2025 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,938 $8,638 n/a
MI0460 # 01 Y:2025 01 2025 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $53,117 $3,200 n/a
MI0460 # 02 Y:2025 02 2025 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $46,085 $240 n/a
MI0460 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,111 $1,620 n/a
MI0460 # 03 Y:2025 03 2025 OPTIMIZE PLANT POWER FACTOR $13,405 $29,632 n/a
MI0460 # 09 Y:2025 09 2025 INSTALL OCCUPANCY SENSORS $1,057 $1,380 n/a
MI0433 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,622 $1,720 n/a
MI0433 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $1,297 $1,752 n/a
MI0433 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,476 $80 n/a
MI0433 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,706 $3,257 n/a
MI0433 # 05 Y:2023 05 2023 PAY UTILITY BILLS ON TIME $202 $0 n/a
MI0415 # 03 Y:2022 03 2022 REPLACE BOILER $73,846 $170,000 Not Implemented
MI0415 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $4,830 $7,950 Not Implemented
MI0415 # 02 Y:2022 02 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,767 $960 Implemented
MI0415 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $10,535 $3,084 Not Implemented
MI0415 # 06 Y:2022 06 2022 INCREASE EFFICIENCY OF TRUCKS $15,778 $12,180 Not Implemented
MI0415 # 05 Y:2022 05 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $142,120 $2,400 Not Implemented
MI0392 # 04 Y:2021 04 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $369 $1,552 Not Implemented
MI0392 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $590 $1,242 Not Implemented
MI0392 # 01 Y:2021 01 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,982 $4,270 Not Implemented
MI0392 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $2,592 $3,961 Not Implemented
MI0371 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $473 $325 Implemented