IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

90

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0239 # 08 Y:2024 08 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,185 $51,431 n/a
DL0239 # 02 Y:2024 02 2024 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,623 $17,500 n/a
DL0239 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,306 $1,250 n/a
DL0239 # 03 Y:2024 03 2024 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $37,050 $110,000 n/a
DL0239 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $397,405 $140,000 n/a
DL0239 # 09 Y:2024 09 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $44,586 $1,934 n/a
DL0239 # 04 Y:2024 04 2024 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $61,029 $10,000 n/a
DL0239 # 05 Y:2024 05 2024 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,543 $2,247 n/a
DL0239 # 07 Y:2024 07 2024 UPGRADE CONTROLS ON COMPRESSORS $61,587 $28,225 n/a
NC0645 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,505 $5,000 Not Implemented
NC0645 # 02 Y:2020 02 2020 RECOVER WASTE HEAT FROM EQUIPMENT $51,058 $178,000 Not Implemented
NC0645 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,683 $40,000 Implemented
NC0601 # 05 Y:2017 05 2017 INSULATE FEEDWATER TANK $792 $750 Not Implemented
NC0601 # 04 Y:2017 04 2017 KEEP BOILER TUBES CLEAN $2,408 $1,000 Implemented
NC0601 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,606 $100 Not Implemented
NC0601 # 07 Y:2017 07 2017 ADOPT IN-HOUSE MATERIAL GENERATION $21,773 $20,000 Not Implemented
NC0601 # 09 Y:2017 09 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,876 $30 Not Implemented
NC0601 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $217 $487 Not Implemented
NC0601 # 06 Y:2017 06 2017 RECOVER WASTE HEAT FROM EQUIPMENT $15,825 $82,000 Not Implemented
NC0601 # 02 Y:2017 02 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,840 $750 Not Implemented
NC0601 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,641 $200 Implemented
NC0586 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,008 $2,890 Implemented
NC0586 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $308 $200 Implemented
NC0586 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $988 $2,500 Implemented
NC0586 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,873 $9,000 Implemented