Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
261
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0423 # 07 Y:2009 | 07 | 2009 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $217,707 | $718,800 | Not Implemented |
SD0423 # 05 Y:2009 | 05 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,107 | $5,200 | Not Implemented |
SD0423 # 06 Y:2009 | 06 | 2009 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,887 | $14,667 | Not Implemented |
SD0423 # 03 Y:2009 | 03 | 2009 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $19,013 | $4,062 | Not Implemented |
SD0423 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,697 | $0 | Not Implemented |
SD0423 # 02 Y:2009 | 02 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $995 | $130 | Not Implemented |
SD0423 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,335 | $300 | Not Implemented |
TT0044 # 07 Y:2009 | 07 | 2009 | USE COMPRESSOR AIR FILTERS | $323 | $75 | Implemented |
TT0044 # 09 Y:2009 | 09 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,198 | $0 | Not Implemented |
TT0044 # 04 Y:2009 | 04 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,180 | $2,000 | Implemented |
TT0044 # 03 Y:2009 | 03 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,850 | $6,000 | Implemented |
TT0044 # 10 Y:2009 | 10 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $373 | $976 | Not Implemented |
TT0044 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,476 | $4,900 | Implemented |
TT0044 # 01 Y:2009 | 01 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,027 | $5,400 | Not Implemented |
TT0044 # 06 Y:2009 | 06 | 2009 | REPAIR OR REPLACE STEAM TRAPS | $1,748 | $4,000 | Implemented |
TT0044 # 02 Y:2009 | 02 | 2009 | REDUCE VENTILATION AIR | $3,415 | $0 | Implemented |
TT0044 # 05 Y:2009 | 05 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $13,904 | $30,870 | Implemented |
SD0421 # 04 Y:2009 | 04 | 2009 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $269,651 | $1,430,000 | Not Implemented |
SD0421 # 01 Y:2009 | 01 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,500 | $6,463 | Not Implemented |
SD0421 # 03 Y:2009 | 03 | 2009 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $94,850 | $12,450 | Not Implemented |
SD0421 # 08 Y:2009 | 08 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $568 | $1,444 | Implemented |
SD0421 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,991 | $16,630 | Not Implemented |
SD0421 # 07 Y:2009 | 07 | 2009 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $60,774 | $175,800 | Not Implemented |
SD0421 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,149 | $2,700 | Implemented |
SD0421 # 02 Y:2009 | 02 | 2009 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $35,684 | $50,000 | Implemented |