IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

363

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0958 # 08 Y:2016 08 2016 USE RADIANT HEATER FOR SPOT HEATING $2,283 $4,147 Not Implemented
OK0958 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,623 $520 Not Implemented
OK0958 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,755 $0 Not Implemented
OK0958 # 12 Y:2016 12 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,996 $0 Implemented
OK0958 # 10 Y:2016 10 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,151 $70,000 Implemented
OK0958 # 11 Y:2016 11 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,955 $100,000 Implemented
OK0958 # 13 Y:2016 13 2016 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $309,693 $1,927,657 Not Implemented
OK0958 # 03 Y:2016 03 2016 REPAIR AND ELIMINATE STEAM LEAKS $7,914 $3,250 Implemented
OK0958 # 05 Y:2016 05 2016 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,954 $1,227 Not Implemented
OK0958 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,461 $2,000 Implemented
OK0958 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,735 $9,149 Implemented
OK0958 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,160 $17,885 Not Implemented
OK0958 # 09 Y:2016 09 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,455 $0 Implemented
WM0099 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $733 $2,000 Not Implemented
WM0099 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $861 $900 Not Implemented
WM0099 # 02 Y:2016 02 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,528 $0 Not Implemented
WM0099 # 12 Y:2016 12 2016 INSULATE BARE EQUIPMENT $274 $315 Implemented
WM0099 # 11 Y:2016 11 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $344 $0 Implemented
WM0099 # 10 Y:2016 10 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $358 $120 Implemented
WM0099 # 01 Y:2016 01 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,017 $11,200 Not Implemented
WM0099 # 09 Y:2016 09 2016 INSULATE BARE EQUIPMENT $685 $481 Not Implemented
WM0099 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,427 $12,056 Not Implemented
WM0099 # 04 Y:2016 04 2016 USE SYNTHETIC LUBRICANT $2,414 $4,360 Not Implemented
WM0099 # 06 Y:2016 06 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $902 $2,200 Not Implemented
WM0099 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,368 $2,600 Not Implemented