Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
224
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0960 # 05 Y:2021 | 05 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $175,754 | $2,009,756 | Not Implemented |
GT0960 # 04 Y:2021 | 04 | 2021 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $39,614 | $149,000 | Not Implemented |
GT0960 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,666 | $8,719 | Implemented |
GT0960 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,573 | $800 | Implemented |
GT0960 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,810 | $1,850 | Implemented |
MI0400 # 04 Y:2021 | 04 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,597 | $320 | Not Implemented |
MI0400 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,855 | $11,226 | Implemented |
MI0400 # 03 Y:2021 | 03 | 2021 | INSTALL OCCUPANCY SENSORS | $5,931 | $3,518 | Implemented |
MI0400 # 01 Y:2021 | 01 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $13,967 | $34,488 | Not Implemented |
MI0400 # 08 Y:2021 | 08 | 2021 | COMBINE UTILITY METERS | $2,837 | $100 | Not Implemented |
MI0400 # 07 Y:2021 | 07 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,897 | $1,980 | Not Implemented |
MI0400 # 05 Y:2021 | 05 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,218 | $1,980 | Not Implemented |
MI0400 # 06 Y:2021 | 06 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,615 | $1,827 | Implemented |
MI0392 # 01 Y:2021 | 01 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,982 | $4,270 | Not Implemented |
MI0392 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $590 | $1,242 | Not Implemented |
MI0392 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $2,592 | $3,961 | Not Implemented |
MI0392 # 04 Y:2021 | 04 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $369 | $1,552 | Not Implemented |
TT0260 # 06 Y:2021 | 06 | 2021 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,508 | $3,500 | Not Implemented |
TT0260 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,791 | $1,660 | Not Implemented |
TT0260 # 07 Y:2021 | 07 | 2021 | INSULATE BARE EQUIPMENT | $783 | $700 | Implemented |
TT0260 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,890 | $3,640 | Not Implemented |
TT0260 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $10,005 | $10,000 | Not Implemented |
TT0260 # 08 Y:2021 | 08 | 2021 | INSTALL OCCUPANCY SENSORS | $401 | $553 | Implemented |
TT0260 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,928 | $300 | Not Implemented |
TT0260 # 04 Y:2021 | 04 | 2021 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $4,069 | $16,500 | Not Implemented |