Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 3111 | Animal Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0099 # 12 Y:2016 | 12 | 2016 | INSULATE BARE EQUIPMENT | $274 | $315 | Implemented |
WM0099 # 11 Y:2016 | 11 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $344 | $0 | Implemented |
WM0099 # 10 Y:2016 | 10 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $358 | $120 | Implemented |
WM0099 # 09 Y:2016 | 09 | 2016 | INSULATE BARE EQUIPMENT | $685 | $481 | Not Implemented |
WM0099 # 08 Y:2016 | 08 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $733 | $2,000 | Not Implemented |
WM0099 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $861 | $900 | Not Implemented |
WM0099 # 06 Y:2016 | 06 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $902 | $2,200 | Not Implemented |
WM0099 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,368 | $2,600 | Not Implemented |
WM0099 # 04 Y:2016 | 04 | 2016 | USE SYNTHETIC LUBRICANT | $2,414 | $4,360 | Not Implemented |
WM0099 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,427 | $12,056 | Not Implemented |
WM0099 # 02 Y:2016 | 02 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,528 | $0 | Not Implemented |
WM0099 # 01 Y:2016 | 01 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,017 | $11,200 | Not Implemented |
WM0035 # 07 Y:2013 | 07 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $594 | $0 | Implemented |
WM0035 # 06 Y:2013 | 06 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,953 | $0 | Implemented |
WM0035 # 05 Y:2013 | 05 | 2013 | INSULATE BARE EQUIPMENT | $1,145 | $200 | Not Implemented |
WM0035 # 04 Y:2013 | 04 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,425 | $2,270 | Implemented |
WM0035 # 03 Y:2013 | 03 | 2013 | REPAIR OR REPLACE STEAM TRAPS | $7,478 | $1,500 | Implemented |
WM0035 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $771 | $0 | Not Implemented |
WM0035 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,932 | $1,000 | Implemented |
WM0032 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,693 | $1,260 | Implemented |
WM0032 # 07 Y:2013 | 07 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,700 | $19,800 | Not Implemented |
WM0032 # 06 Y:2013 | 06 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,500 | $20,654 | Not Implemented |
WM0032 # 05 Y:2013 | 05 | 2013 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $91 | $137 | Not Implemented |
WM0032 # 04 Y:2013 | 04 | 2013 | INSTALL OCCUPANCY SENSORS | $276 | $270 | Not Implemented |
WM0032 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,268 | $11,516 | Not Implemented |