Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
537
matching recommendationsNAICS | 31111 | Animal Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0539 # 03 Y:2015 | 03 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,119 | $3,351 | Implemented |
IA0539 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $1,043 | $2,270 | Not Implemented |
IA0539 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $976 | $200 | Implemented |
MZ0185 # 01 Y:2015 | 01 | 2015 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $444,193 | $2,686,745 | Not Implemented |
MZ0185 # 02 Y:2015 | 02 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,593 | $7,228 | Implemented |
MZ0185 # 03 Y:2015 | 03 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $16,223 | $0 | Not Implemented |
MZ0185 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,296 | $9,730 | Implemented |
MZ0185 # 05 Y:2015 | 05 | 2015 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $92,880 | $450,000 | Not Implemented |
MZ0185 # 06 Y:2015 | 06 | 2015 | USE PHOTOCELL CONTROLS | $30,214 | $15,000 | Implemented |
MZ0136 # 01 Y:2014 | 01 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $16,626 | $290 | Implemented |
MZ0136 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $672 | $1,600 | Implemented |
MZ0136 # 03 Y:2014 | 03 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $282 | $50 | Implemented |
MZ0136 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,785 | $18,300 | Implemented |
MZ0136 # 05 Y:2014 | 05 | 2014 | INSTALL OCCUPANCY SENSORS | $16,863 | $910 | Implemented |
MZ0136 # 06 Y:2014 | 06 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,112 | $2,840 | Not Implemented |
MZ0136 # 07 Y:2014 | 07 | 2014 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $13,943 | $63,000 | Not Implemented |
MZ0136 # 08 Y:2014 | 08 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $44,793 | $7,900 | Not Implemented |
MZ0136 # 09 Y:2014 | 09 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,564 | $0 | Not Implemented |
WM0035 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,932 | $1,000 | Implemented |
WM0035 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $771 | $0 | Not Implemented |
WM0035 # 03 Y:2013 | 03 | 2013 | REPAIR OR REPLACE STEAM TRAPS | $7,478 | $1,500 | Implemented |
WM0035 # 04 Y:2013 | 04 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,425 | $2,270 | Implemented |
WM0035 # 05 Y:2013 | 05 | 2013 | INSULATE BARE EQUIPMENT | $1,145 | $200 | Not Implemented |
WM0035 # 06 Y:2013 | 06 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,953 | $0 | Implemented |
WM0035 # 07 Y:2013 | 07 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $594 | $0 | Implemented |