IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

537

matching recommendations
Reset
NAICS 31111 Animal Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0471 # 03 Y:2004 03 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,020 $270 Implemented
AM0471 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,450 $400 Implemented
AM0471 # 05 Y:2004 05 2004 USE SYNTHETIC LUBRICANT $1,920 $0 Implemented
AM0471 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $1,110 $170 Implemented
AM0471 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230 $630 Implemented
CO0545 # 01 Y:2004 01 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $8,950 $1,500 Implemented
CO0545 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $5,800 $1,760 Implemented
CO0545 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $355 $800 Implemented
CO0545 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,170 $420 Implemented
CO0545 # 05 Y:2004 05 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,290 $250 Not Implemented
IA0340 # 01 Y:2004 01 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,674 $2,382 Not Implemented
IA0340 # 02 Y:2004 02 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,101 $1,000 Implemented
IA0340 # 03 Y:2004 03 2004 CONTROL PRESSURE ON STEAMER OPERATIONS $18,750 $4,940 Implemented
IA0340 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $343 $263 Not Implemented
IA0340 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $686 $962 Implemented
IA0340 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,946 $135 Implemented
IA0340 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,093 $4,412 Not Implemented
IA0340 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $787 $1,397 Not Implemented
IA0340 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,397 $1,494 Not Implemented
IA0340 # 10 Y:2004 10 2004 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS $12,424 $12,000 Not Implemented
IA0340 # 11 Y:2004 11 2004 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $16,000 $36,000 Implemented
BD0256 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $146,428 $60,000 Implemented
BD0256 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $62,641 $14,500 Implemented
BD0256 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,608 $0 Implemented
BD0256 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,310 $645 Not Implemented