IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 31111 Animal Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0317 # 08 Y:2005 08 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,189 $5,346 Implemented
SF0317 # 07 Y:2005 07 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,370 $50,000 Implemented
SF0317 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $187 $480 Implemented
SF0317 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,170 $771 Implemented
SF0317 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,124 $948 Implemented
SF0317 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $679 $0 Implemented
SU0222 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $521 $206 Implemented
SU0222 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,578 $264 Implemented
SU0222 # 06 Y:2005 06 2005 INCREASE EFFICIENCY OF TRUCKS $15,840 $2,350 Implemented
SU0222 # 05 Y:2005 05 2005 INSTALL TURBULATORS $2,357 $246 Implemented
SU0222 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $5,727 $142 Implemented
SU0222 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,352 $0 Implemented
SU0222 # 01 Y:2005 01 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,489 $0 Implemented
SU0222 # 10 Y:2005 10 2005 INSTALL OCCUPANCY SENSORS $211 $127 Implemented
SU0222 # 12 Y:2005 12 2005 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $200 $342 Implemented
SU0222 # 13 Y:2005 13 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $155 $292 Implemented
SU0222 # 11 Y:2005 11 2005 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,287 $895 Implemented
LM0103 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,470 $72,000 Implemented
CO0567 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,013 $1,156 Implemented
CO0567 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $510 $1,810 Implemented
CO0567 # 04 Y:2005 04 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,350 $4,820 Implemented
CO0567 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,500 $11,600 Implemented
UD0720 # 13 Y:2005 13 2005 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $390 $0 Implemented
UD0720 # 11 Y:2005 11 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $554 $0 Implemented
UD0720 # 10 Y:2005 10 2005 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,072 $2,000 Implemented