Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 3112 Grain and Oilseed Milling
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0220 # 06 Y:2019 06 2019 MINIMIZE WATER USAGE $9,210 $11,980 Implemented
IC0220 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $17,321 $4,875 Implemented
IC0220 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $75,268 $7,000 Implemented
BD0448 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,011 $10,000 Implemented
BD0448 # 15 Y:2014 15 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,650 $30,000 Implemented
BD0448 # 13 Y:2014 13 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $668 $600 Implemented
BD0448 # 12 Y:2014 12 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,070 $40 Implemented
BD0448 # 09 Y:2014 09 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,990 $1,000 Implemented
BD0448 # 08 Y:2014 08 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,695 $3,000 Implemented
BD0448 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $3,869 $1,625 Implemented
BD0448 # 06 Y:2014 06 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $13,135 $30,000 Implemented
BD0448 # 05 Y:2014 05 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,680 $9,880 Implemented
BD0448 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,582 $17,750 Implemented
BD0448 # 02 Y:2014 02 2014 INSTALL TURBULATORS $18,699 $5,000 Implemented
BD0448 # 01 Y:2014 01 2014 IMPROVE COMBUSTION CONTROL CAPABILITY $51,953 $95,000 Implemented
BD0286 # 01 Y:2005 01 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $140,820 $28,500 Implemented
BD0286 # 13 Y:2005 13 2005 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $2,243,590 $504,283 Implemented
BD0286 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $464 $350 Implemented
BD0286 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,506 $0 Implemented
BD0286 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,152 $1,200 Implemented
BD0286 # 06 Y:2005 06 2005 INSTALL TURBULATORS $8,810 $12,000 Implemented
BD0286 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $9,987 $2,625 Implemented
BD0286 # 04 Y:2005 04 2005 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,974 $14,000 Implemented
BD0286 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $94,025 $122,830 Implemented