Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
638
matching recommendationsNAICS | 3112 | Grain and Oilseed Milling |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0087 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,755 | $189 | Not Implemented |
IP0087 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $3,851 | $308 | Not Implemented |
IP0087 # 05 Y:2017 | 05 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,139 | $432 | Implemented |
IP0087 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $21,213 | $2,430 | Implemented |
IP0087 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,313 | $7,280 | Implemented |
IP0087 # 08 Y:2017 | 08 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $509 | $529 | Not Implemented |
IP0087 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $332 | $798 | Implemented |
IP0087 # 10 Y:2017 | 10 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $606,139 | $2,150,000 | Not Implemented |
SF0501 # 01 Y:2017 | 01 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,520 | $0 | Implemented |
SF0501 # 02 Y:2017 | 02 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,047 | $0 | Not Implemented |
SF0501 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $777 | $84 | Not Implemented |
SF0501 # 04 Y:2017 | 04 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,074 | $1,769 | Implemented |
SF0501 # 05 Y:2017 | 05 | 2017 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,356 | $1,821 | Not Implemented |
SF0501 # 06 Y:2017 | 06 | 2017 | USE SOLAR HEAT TO MAKE ELECTRICTY | $147,360 | $665,154 | Not Implemented |
IA0557 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $44,271 | $95,210 | Not Implemented |
IA0557 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,548 | $500 | Not Implemented |
IA0557 # 03 Y:2016 | 03 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,367 | $29,084 | Not Implemented |
IA0557 # 04 Y:2016 | 04 | 2016 | OPTIMIZE PLANT POWER FACTOR | $4,037 | $4,835 | Not Implemented |
IA0557 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $3,284 | $5,488 | Not Implemented |
IA0557 # 06 Y:2016 | 06 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,719 | $5,030 | Implemented |
IA0557 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,648 | $189 | Implemented |
IA0557 # 08 Y:2016 | 08 | 2016 | INSULATE BARE EQUIPMENT | $553 | $242 | Implemented |
IA0557 # 09 Y:2016 | 09 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $461 | $35 | Implemented |
IA0557 # 10 Y:2016 | 10 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $420 | $398 | Not Implemented |
TT0173 # 10 Y:2016 | 10 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,807 | $10,850 | Not Implemented |