IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 3112 Grain and Oilseed Milling
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0562 # 01 Y:2024 01 2024 INSTALL TIMERS AND/OR THERMOSTATS $4,513 $320 n/a
LE0562 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $1,612 $350 n/a
LE0562 # 03 Y:2024 03 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $27,865 $27,000 n/a
LE0562 # 04 Y:2024 04 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,836 $5,000 n/a
LE0562 # 05 Y:2024 05 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $727 $1,000 n/a
LE0562 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,738 $13,669 n/a
LE0562 # 07 Y:2024 07 2024 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,491 $8,000 n/a
LE0562 # 08 Y:2024 08 2024 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $13,989 $60,600 n/a
DL0230 # 07 Y:2024 07 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,919 $2,200 n/a
DL0230 # 01 Y:2024 01 2024 UPGRADE CONTROLS ON COMPRESSORS $13,779 $15,504 n/a
DL0230 # 02 Y:2024 02 2024 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $44,058 $22,437 n/a
DL0230 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $100,915 $74,000 n/a
DL0230 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $3,146 $2,040 n/a
DL0230 # 05 Y:2024 05 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,418 $0 n/a
DL0230 # 06 Y:2024 06 2024 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $15,141 $10,000 n/a
LE0540 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $841 $1,040 Not Implemented
LE0540 # 07 Y:2023 07 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $128,214 $580,000 Not Implemented
LE0540 # 06 Y:2023 06 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,386 $45,000 Not Implemented
LE0540 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $1,080 $1,908 Not Implemented
LE0540 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,521 $9,000 Not Implemented
LE0540 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,247 $36,000 Not Implemented
LE0540 # 01 Y:2023 01 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,565 $11,000 Not Implemented
LE0499 # 01 Y:2021 01 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $60,388 $0 Implemented
LE0499 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,271 $5,600 Implemented
LE0499 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $73,216 $57,400 Not Implemented