Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 3112 | Grain and Oilseed Milling |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0448 # 02 Y:2014 | 02 | 2014 | INSTALL TURBULATORS | $18,699 | $5,000 | Implemented |
BD0448 # 14 Y:2014 | 14 | 2014 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $61,924 | $25,000 | Not Implemented |
BD0448 # 13 Y:2014 | 13 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $668 | $600 | Implemented |
BD0448 # 12 Y:2014 | 12 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,070 | $40 | Implemented |
BD0448 # 11 Y:2014 | 11 | 2014 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,517 | $45 | Not Implemented |
BD0448 # 10 Y:2014 | 10 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,621 | $120 | Not Implemented |
BD0448 # 09 Y:2014 | 09 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,990 | $1,000 | Implemented |
BD0448 # 08 Y:2014 | 08 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,695 | $3,000 | Implemented |
BD0448 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $3,869 | $1,625 | Implemented |
BD0448 # 06 Y:2014 | 06 | 2014 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $13,135 | $30,000 | Implemented |
BD0448 # 05 Y:2014 | 05 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,680 | $9,880 | Implemented |
BD0448 # 04 Y:2014 | 04 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,011 | $10,000 | Implemented |
BD0448 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,582 | $17,750 | Implemented |
BD0448 # 01 Y:2014 | 01 | 2014 | IMPROVE COMBUSTION CONTROL CAPABILITY | $51,953 | $95,000 | Implemented |
BD0448 # 15 Y:2014 | 15 | 2014 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $10,650 | $30,000 | Implemented |
OR0629 # 04 Y:2014 | 04 | 2014 | REPLACE BOILER | $523,306 | $3,403,664 | Implemented |
OR0629 # 03 Y:2014 | 03 | 2014 | RECOVER AND REUSE COOLING WATER | $58,681 | $3,764 | Implemented |
OR0629 # 02 Y:2014 | 02 | 2014 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $37,863 | $38,930 | Not Implemented |
OR0629 # 01 Y:2014 | 01 | 2014 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $37,907 | $21,000 | Implemented |
IP0022 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,259 | $0 | Implemented |
IP0022 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $870 | $1,590 | Implemented |
IP0022 # 06 Y:2014 | 06 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,458 | $2,226 | Not Implemented |
IP0022 # 05 Y:2014 | 05 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,308 | $3,528 | Implemented |
IP0022 # 04 Y:2014 | 04 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,868 | $2,394 | Not Implemented |
IP0022 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $631 | $212 | Not Implemented |