IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 3112 Grain and Oilseed Milling
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0530 # 08 Y:2018 08 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $97,224 $532,260 Not Implemented
SF0530 # 07 Y:2018 07 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $14,120 $58,070 Implemented
SF0530 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $209 $564 Implemented
SF0530 # 05 Y:2018 05 2018 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,743 $4,357 Implemented
SF0530 # 04 Y:2018 04 2018 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,255 $11,220 Implemented
SF0530 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,808 $97,552 Implemented
SF0530 # 02 Y:2018 02 2018 UPGRADE CONTROLS ON COMPRESSORS $13,070 $22,633 Implemented
SF0530 # 01 Y:2018 01 2018 INSTALL TIMERS AND/OR THERMOSTATS $6,177 $2,407 Implemented
UU0137 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,310 $7,650 Implemented
UU0137 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,622 $7,600 Implemented
UU0137 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $26,521 $17,000 Implemented
UU0137 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,021 $24,600 Implemented
UU0137 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $48,448 $23,000 Not Implemented
UU0137 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $973 $3,500 Implemented
NL0020 # 04 Y:2018 04 2018 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $81 $200 Implemented
NL0020 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $543 $2,476 Not Implemented
NL0020 # 02 Y:2018 02 2018 AIR CONDITION ONLY SPACE NECESSARY $1,869 $56 Implemented
NL0020 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,414 $29,401 Implemented
SU0456 # 08 Y:2018 08 2018 INSTALL OCCUPANCY SENSORS $6,863 $15,312 Implemented
SU0456 # 07 Y:2018 07 2018 OPTIMIZE PLANT POWER FACTOR $27,797 $38,674 Implemented
SU0456 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $194 $125 Implemented
SU0456 # 05 Y:2018 05 2018 ELIMINATE/REDUCE AN OPERATION $5,417 $1,800 Implemented
SU0456 # 04 Y:2018 04 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $28,600 $675 Implemented
SU0456 # 03 Y:2018 03 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $150 $0 Implemented
SU0456 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $717 $0 Implemented