Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
191
matching recommendationsNAICS | 31122 | Starch and Vegetable Fats and Oils Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0347 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,827 | $220 | Not Implemented |
MZ0347 # 06 Y:2023 | 06 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $1,668 | $380 | Implemented |
MZ0347 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $3,495 | $1,500 | Not Implemented |
MZ0347 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $91,034 | $35,384 | Implemented |
MZ0347 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,683 | $0 | Implemented |
MZ0347 # 07 Y:2023 | 07 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,124 | $22,000 | Not Implemented |
MZ0347 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,018 | $1,320 | Not Implemented |
LE0540 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $841 | $1,040 | Not Implemented |
LE0540 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $1,080 | $1,908 | Not Implemented |
LE0540 # 06 Y:2023 | 06 | 2023 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $11,386 | $45,000 | Not Implemented |
LE0540 # 01 Y:2023 | 01 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,565 | $11,000 | Not Implemented |
LE0540 # 07 Y:2023 | 07 | 2023 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $128,214 | $580,000 | Not Implemented |
LE0540 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,247 | $36,000 | Not Implemented |
LE0540 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,521 | $9,000 | Not Implemented |
SF0532 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $879 | $0 | Implemented |
SF0532 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,844 | $20,718 | Implemented |
SF0532 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $950 | $2,757 | Implemented |
SF0532 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $1,777 | $4,972 | Not Implemented |
SF0532 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $2,762 | $4,681 | Not Implemented |
SF0532 # 07 Y:2019 | 07 | 2019 | REPLACE BOILER | $20,414 | $108,576 | Implemented |
SF0532 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,025 | $8,491 | Implemented |
SF0530 # 08 Y:2018 | 08 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $97,224 | $532,260 | Not Implemented |
SF0530 # 07 Y:2018 | 07 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $14,120 | $58,070 | Implemented |
SF0530 # 06 Y:2018 | 06 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $209 | $564 | Implemented |
SF0530 # 05 Y:2018 | 05 | 2018 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,743 | $4,357 | Implemented |