Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
107
matching recommendationsNAICS | 31122 | Starch and Vegetable Fats and Oils Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0347 # 06 Y:2023 | 06 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $1,668 | $380 | Implemented |
MZ0347 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $91,034 | $35,384 | Implemented |
MZ0347 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,683 | $0 | Implemented |
SF0532 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,025 | $8,491 | Implemented |
SF0532 # 07 Y:2019 | 07 | 2019 | REPLACE BOILER | $20,414 | $108,576 | Implemented |
SF0532 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $950 | $2,757 | Implemented |
SF0532 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $879 | $0 | Implemented |
SF0532 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,844 | $20,718 | Implemented |
SF0530 # 05 Y:2018 | 05 | 2018 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,743 | $4,357 | Implemented |
SF0530 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,808 | $97,552 | Implemented |
SF0530 # 01 Y:2018 | 01 | 2018 | INSTALL TIMERS AND/OR THERMOSTATS | $6,177 | $2,407 | Implemented |
SF0530 # 04 Y:2018 | 04 | 2018 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $5,255 | $11,220 | Implemented |
SF0530 # 06 Y:2018 | 06 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $209 | $564 | Implemented |
SF0530 # 02 Y:2018 | 02 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $13,070 | $22,633 | Implemented |
SF0530 # 07 Y:2018 | 07 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $14,120 | $58,070 | Implemented |
NL0020 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,414 | $29,401 | Implemented |
NL0020 # 02 Y:2018 | 02 | 2018 | AIR CONDITION ONLY SPACE NECESSARY | $1,869 | $56 | Implemented |
NL0020 # 04 Y:2018 | 04 | 2018 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $81 | $200 | Implemented |
SF0508 # 02 Y:2017 | 02 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $20,198 | $2,023 | Implemented |
SF0508 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,954 | $26,825 | Implemented |
SF0508 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,154 | $0 | Implemented |
IP0087 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,313 | $7,280 | Implemented |
IP0087 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $332 | $798 | Implemented |
IP0087 # 05 Y:2017 | 05 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,139 | $432 | Implemented |
IP0087 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $21,213 | $2,430 | Implemented |