IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
NAICS 311230 Breakfast Cereal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0173 # 13 Y:2016 13 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,965 $4,000 Not Implemented
TT0173 # 14 Y:2016 14 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $345 $800 Not Implemented
TT0173 # 15 Y:2016 15 2016 MINIMIZE WATER USAGE $411 $248 Not Implemented
BD0448 # 01 Y:2014 01 2014 IMPROVE COMBUSTION CONTROL CAPABILITY $51,953 $95,000 Implemented
BD0448 # 02 Y:2014 02 2014 INSTALL TURBULATORS $18,699 $5,000 Implemented
BD0448 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,582 $17,750 Implemented
BD0448 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,011 $10,000 Implemented
BD0448 # 05 Y:2014 05 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,680 $9,880 Implemented
BD0448 # 06 Y:2014 06 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $13,135 $30,000 Implemented
BD0448 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $3,869 $1,625 Implemented
BD0448 # 08 Y:2014 08 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,695 $3,000 Implemented
BD0448 # 09 Y:2014 09 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,990 $1,000 Implemented
BD0448 # 10 Y:2014 10 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,621 $120 Not Implemented
BD0448 # 11 Y:2014 11 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,517 $45 Not Implemented
BD0448 # 12 Y:2014 12 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,070 $40 Implemented
BD0448 # 13 Y:2014 13 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $668 $600 Implemented
BD0448 # 14 Y:2014 14 2014 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $61,924 $25,000 Not Implemented
BD0448 # 15 Y:2014 15 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,650 $30,000 Implemented
OR0618 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,881 $3,300 Not Implemented
OR0618 # 02 Y:2013 02 2013 MODIFY STARTUP/SHUTDOWN TIMES $10,380 $800 Not Implemented
OR0618 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $977 $1,975 Not Implemented
OR0618 # 04 Y:2013 04 2013 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $9,796 $50,179 Not Implemented
OR0618 # 05 Y:2013 05 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,187 $2,283 Not Implemented
SF0428 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,313 $0 Implemented
SF0428 # 02 Y:2013 02 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $5,121 $0 Implemented