Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
131
matching recommendationsNAICS | 311230 | Breakfast Cereal Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0173 # 13 Y:2016 | 13 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,965 | $4,000 | Not Implemented |
TT0173 # 14 Y:2016 | 14 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $345 | $800 | Not Implemented |
TT0173 # 15 Y:2016 | 15 | 2016 | MINIMIZE WATER USAGE | $411 | $248 | Not Implemented |
BD0448 # 01 Y:2014 | 01 | 2014 | IMPROVE COMBUSTION CONTROL CAPABILITY | $51,953 | $95,000 | Implemented |
BD0448 # 02 Y:2014 | 02 | 2014 | INSTALL TURBULATORS | $18,699 | $5,000 | Implemented |
BD0448 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,582 | $17,750 | Implemented |
BD0448 # 04 Y:2014 | 04 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,011 | $10,000 | Implemented |
BD0448 # 05 Y:2014 | 05 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,680 | $9,880 | Implemented |
BD0448 # 06 Y:2014 | 06 | 2014 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $13,135 | $30,000 | Implemented |
BD0448 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $3,869 | $1,625 | Implemented |
BD0448 # 08 Y:2014 | 08 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,695 | $3,000 | Implemented |
BD0448 # 09 Y:2014 | 09 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,990 | $1,000 | Implemented |
BD0448 # 10 Y:2014 | 10 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,621 | $120 | Not Implemented |
BD0448 # 11 Y:2014 | 11 | 2014 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,517 | $45 | Not Implemented |
BD0448 # 12 Y:2014 | 12 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,070 | $40 | Implemented |
BD0448 # 13 Y:2014 | 13 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $668 | $600 | Implemented |
BD0448 # 14 Y:2014 | 14 | 2014 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $61,924 | $25,000 | Not Implemented |
BD0448 # 15 Y:2014 | 15 | 2014 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $10,650 | $30,000 | Implemented |
OR0618 # 01 Y:2013 | 01 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,881 | $3,300 | Not Implemented |
OR0618 # 02 Y:2013 | 02 | 2013 | MODIFY STARTUP/SHUTDOWN TIMES | $10,380 | $800 | Not Implemented |
OR0618 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $977 | $1,975 | Not Implemented |
OR0618 # 04 Y:2013 | 04 | 2013 | IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) | $9,796 | $50,179 | Not Implemented |
OR0618 # 05 Y:2013 | 05 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,187 | $2,283 | Not Implemented |
SF0428 # 01 Y:2013 | 01 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,313 | $0 | Implemented |
SF0428 # 02 Y:2013 | 02 | 2013 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $5,121 | $0 | Implemented |