IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 3113 Sugar and Confectionery Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0532 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,393 $5,160 Not Implemented
LE0532 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,119 $460 Not Implemented
LE0532 # 01 Y:2022 01 2022 PAY UTILITY BILLS ON TIME $1,087 $0 Not Implemented
LE0532 # 06 Y:2022 06 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $32,155 $99,432 Not Implemented
LE0532 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,896 $15,000 Not Implemented
LE0532 # 04 Y:2022 04 2022 PREHEAT COMBUSTION AIR WITH WASTE HEAT $30,125 $80,000 Not Implemented
LE0532 # 07 Y:2022 07 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $33,992 $200,000 Not Implemented
LE0284 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,628 $1,760 Implemented
LE0284 # 13 Y:2009 13 2009 INSTALL OCCUPANCY SENSORS $685 $675 Not Implemented
LE0284 # 12 Y:2009 12 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,937 $10,491 Not Implemented
LE0284 # 11 Y:2009 11 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $771 $800 Not Implemented
LE0284 # 10 Y:2009 10 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,713 $224 Implemented
LE0284 # 09 Y:2009 09 2009 REPAIR OR REPLACE STEAM TRAPS $2,855 $2,000 Implemented
LE0284 # 08 Y:2009 08 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,911 $320 Implemented
LE0284 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,560 $7,000 Not Implemented
LE0284 # 06 Y:2009 06 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,526 $8,000 Not Implemented
LE0284 # 05 Y:2009 05 2009 USE SOLAR HEAT TO HEAT WATER $7,038 $28,000 Not Implemented
LE0284 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $11,124 $8,000 Not Implemented
LE0284 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $26,473 $20,000 Not Implemented
LE0284 # 01 Y:2009 01 2009 UPGRADE OBSOLETE EQUIPMENT $42,827 $30,000 Not Implemented
LE0233 # 08 Y:2006 08 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $789 $1,000 Not Implemented
LE0233 # 06 Y:2006 06 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,416 $2,500 Not Implemented
LE0233 # 05 Y:2006 05 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,990 $3,000 Not Implemented
LE0233 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,332 $800 Implemented
LE0233 # 03 Y:2006 03 2006 INSTALL TIMERS AND/OR THERMOSTATS $8,534 $2,100 Not Implemented