Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
78
matching recommendationsNAICS | 31134 | Nonchocolate Confectionery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0138 # 01 Y:2015 | 01 | 2015 | INSULATE BARE EQUIPMENT | $165,235 | $79,620 | Not Implemented |
DL0138 # 02 Y:2015 | 02 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $81,150 | $0 | Implemented |
DL0138 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $65,410 | $20,000 | Implemented |
DL0138 # 05 Y:2015 | 05 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,660 | $19,415 | Not Implemented |
DL0138 # 12 Y:2015 | 12 | 2015 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,315 | $0 | Not Implemented |
DL0138 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,645 | $13,720 | Implemented |
DL0138 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,280 | $61,980 | Implemented |
DL0138 # 08 Y:2015 | 08 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,480 | $0 | Not Implemented |
DL0138 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,355 | $7,475 | Not Implemented |
DL0138 # 06 Y:2015 | 06 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,465 | $650 | Not Implemented |
DL0138 # 07 Y:2015 | 07 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,870 | $1,700 | Not Implemented |
IP0023 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,844 | $59 | Not Implemented |
IP0023 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $21,826 | $0 | Not Implemented |
IP0023 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $124 | $245 | Not Implemented |
IP0023 # 08 Y:2014 | 08 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,491 | $2,716 | Not Implemented |
IP0023 # 07 Y:2014 | 07 | 2014 | HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS | $20,119 | $16,444 | Not Implemented |
IP0023 # 06 Y:2014 | 06 | 2014 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,202 | $1,970 | Not Implemented |
IP0023 # 05 Y:2014 | 05 | 2014 | INSTALL OCCUPANCY SENSORS | $43 | $30 | Not Implemented |
IP0023 # 04 Y:2014 | 04 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $66 | $13 | Not Implemented |
IP0023 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $251 | $0 | Not Implemented |
SF0429 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,006 | $16,020 | Not Implemented |
SF0429 # 02 Y:2013 | 02 | 2013 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $578 | $810 | Implemented |
SF0429 # 01 Y:2013 | 01 | 2013 | OPERATE BOILERS ON HIGH FIRE SETTING | $18,109 | $0 | Not Implemented |
SF0429 # 05 Y:2013 | 05 | 2013 | USE COMPRESSOR AIR FILTERS | $9,736 | $36,817 | Implemented |
SF0429 # 04 Y:2013 | 04 | 2013 | INSTALL OCCUPANCY SENSORS | $14,210 | $38,634 | Not Implemented |