IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

243

matching recommendations
Reset
NAICS 31135 Chocolate and Confectionery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0382 # 09 Y:2010 09 2010 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $165,218 $158,868 Not Implemented
SF0382 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $12,608 $36,493 Implemented
SF0382 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $733 $2,953 Implemented
SF0382 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,423 $62,855 Implemented
LE0284 # 01 Y:2009 01 2009 UPGRADE OBSOLETE EQUIPMENT $42,827 $30,000 Not Implemented
LE0284 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $26,473 $20,000 Not Implemented
LE0284 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $11,124 $8,000 Not Implemented
LE0284 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,628 $1,760 Implemented
LE0284 # 05 Y:2009 05 2009 USE SOLAR HEAT TO HEAT WATER $7,038 $28,000 Not Implemented
LE0284 # 06 Y:2009 06 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,526 $8,000 Not Implemented
LE0284 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,560 $7,000 Not Implemented
LE0284 # 08 Y:2009 08 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,911 $320 Implemented
LE0284 # 09 Y:2009 09 2009 REPAIR OR REPLACE STEAM TRAPS $2,855 $2,000 Implemented
LE0284 # 10 Y:2009 10 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,713 $224 Implemented
LE0284 # 11 Y:2009 11 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $771 $800 Not Implemented
LE0284 # 12 Y:2009 12 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,937 $10,491 Not Implemented
LE0284 # 13 Y:2009 13 2009 INSTALL OCCUPANCY SENSORS $685 $675 Not Implemented
UW0013 # 01 Y:2008 01 2008 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $3,676 $593 Not Implemented
UW0013 # 02 Y:2008 02 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,365 $130 Not Implemented
UW0013 # 03 Y:2008 03 2008 UPGRADE OBSOLETE EQUIPMENT $1,913 $6,000 Not Implemented
UW0013 # 04 Y:2008 04 2008 USE SOLAR HEAT FOR HEAT $1,498 $4,250 Not Implemented
UW0013 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $544 $0 Implemented
UW0013 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $522 $1,787 Not Implemented
OR0520 # 01 Y:2007 01 2007 COMBINE UTILITY METERS $33,600 $32,500 Implemented
OR0520 # 02 Y:2007 02 2007 $15,400 $0 Implemented