IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,571

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0513 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,395 $10,091 Not Implemented
SF0513 # 05 Y:2018 05 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $64,975 $191,474 Implemented
UF0513 # 01 Y:2017 01 2017 REPLACE BOILER $38,664 $30,000 Not Implemented
UF0513 # 02 Y:2017 02 2017 ISOLATE HOT OR COLD EQUIPMENT $25,893 $3,150 Implemented
UF0513 # 03 Y:2017 03 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,487 $23,157 Implemented
UF0513 # 04 Y:2017 04 2017 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $7,542 $0 Implemented
UF0513 # 05 Y:2017 05 2017 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,342 $27,695 Implemented
UF0513 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,848 $10,386 Not Implemented
UF0513 # 07 Y:2017 07 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,443 $1,481 Implemented
UF0513 # 08 Y:2017 08 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,095 $5,053 Implemented
OR0694 # 01 Y:2017 01 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $190,250 $7,842 Not Implemented
OR0694 # 02 Y:2017 02 2017 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $78,503 $7,018 Not Implemented
OR0694 # 03 Y:2017 03 2017 INSTALL BACK-UP EQUIPMENT $219,130 $45,000 Not Implemented
OR0694 # 04 Y:2017 04 2017 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $29,962 $12,100 Not Implemented
OR0694 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,605 $10,606 Not Implemented
OR0694 # 06 Y:2017 06 2017 MINIMIZE WATER USAGE $8,079 $15,125 Not Implemented
TT0198 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $9,284 $50 Implemented
TT0198 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $7,752 $3,175 Implemented
TT0198 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,564 $34,509 Not Implemented
TT0198 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,495 $3,050 Not Implemented
TT0198 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $329 $1,600 Implemented
TR0002 # 01 Y:2017 01 2017 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $30,725 $22,000 Implemented
TR0002 # 02 Y:2017 02 2017 USE OPTIMUM THICKNESS INSULATION $6,968 $500 Implemented
TR0002 # 03 Y:2017 03 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $9,895 $10,000 Not Implemented
TR0002 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $187 $55 Implemented